IAC logo
IAC Assessment: MS0449
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0449
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2025
Principal Product Electrical Cabinets
NAICS 332322 - Sheet Metal Work Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 94
Plant Area (Sq.Ft.) 200,000
Annual Production 400,000 Units
Production Hrs. Annual 2,184
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $222,987 1,874,600 kWh $0.12
Electricity Demand $36,066 8,088 kW-months/year $4.46
Natural Gas $67,114 20,200 MMBtu $3.32
LPG $29,053 914 MMBtu $31.80
TOTAL ENERGY COSTS $363,292
RECOMMENDED SAVINGS* $84,175 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7495 INSTALL REPLACEMENT DOORS Savings:
$13,143
Cost:
$8,336
- - - - $13,143 4,040 - - - - -
-
kWh
-
-
kW-months/year
$13,143
4,040
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,428
Cost:
$5,389
$4,353 36,599 $75 17 - - - - - - $4,353
36,599
kWh
$75
17
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$10,000
Cost:
$18,185
- - - - - - - - $10,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$10,000
-
$
04: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$11,235
Cost:
$15,450
$(-53) (-449) - - $11,288 3,400 - - - - $(-53)
(-449)
kWh
-
-
kW-months/year
$11,288
3,400
MMBtu
-
-
$
-
-
$
05: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$24,000
Cost:
$14,060
- - - - - - $24,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$24,000
-
$
-
-
$
06: 3.7312 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS Savings:
$21,369
Cost:
$10,437
$21,369 179,649 - - - - - - - - $21,369
179,649
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$84,175
Cost:
$71,857
$25,669 215,799 $75 17 $24,431 7,440 $24,000 - $10,000 - $25,669
215,799
kWh
$75
17
kW-months/year
$24,431
7,440
MMBtu
$24,000
-
$
$10,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost