IAC logo
IAC Assessment: MU0017
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MU0017
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Michigan State University
Assessment Year 2022
Principal Product Material and Municipal Waste
NAICS 562920 - Materials Recovery Facilities
SIC 8999 - Services, Nec
Sales $500,000-$1,000,000
# of Employees 40
Plant Area (Sq.Ft.) 35,000
Annual Production 18,000 Tons
Production Hrs. Annual 2,340
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $44,693 703,240 kWh $0.06
Electricity Demand $23,371 2,373 kW-months/year $9.85
Electricity Fees $73,249 - $ -
TOTAL ENERGY COSTS $141,313
RECOMMENDED SAVINGS* $4,080 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,943
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Electricity Usage Electricity Demand Other Liquid (non-haz)
$ kWh $ kW-months/year $ gal
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$106
Cost:
$240
$86 1,413 $20 2 - - $86
1,413
kWh
$20
2
kW-months/year
-
-
gal
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,860
Cost:
-
- - - - $2,860 891 -
-
kWh
-
-
kW-months/year
$2,860
891
gal
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$31
Cost:
-
$25 416 $6 1 - - $25
416
kWh
$6
1
kW-months/year
-
-
gal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$364
Cost:
$555
$297 4,946 $67 7 - - $297
4,946
kWh
$67
7
kW-months/year
-
-
gal
05: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$719
Cost:
$75
$587 9,778 $132 13 - - $587
9,778
kWh
$132
13
kW-months/year
-
-
gal
TOTAL RECOMMENDED Savings:
$4,080
Cost:
$870
$995 16,553 $225 23 $2,860 891 $995
16,553
kWh
$225
23
kW-months/year
$2,860
891
gal
TOTAL IMPLEMENTED Savings:
$3,943
Cost:
$630
$884 14,724 $199 20 $2,860 891 $884
14,724
kWh
$199
20
kW-months/year
$2,860
891
gal
Savings
Cost
$ kWh $ kW-months/year $ gal
Electricity Usage Electricity Demand Other Liquid (non-haz) Electricity Usage Electricity Demand Other Liquid (non-haz)