IAC logo
IAC Assessment: MU0018
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MU0018
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Michigan State University
Assessment Year 2022
Principal Product Bare Printed Circuit Boards
NAICS 334412 - Bare Printed Circuit Board Manufacturing
SIC 3672 - Printed Circuit Boards
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 150,000
Annual Production 2,777,230 Units
Production Hrs. Annual 6,240
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $468,285 11,233,744 kWh $0.04
Electricity Demand $340,917 42,851 kW-months/year $7.96
Electricity Fees $42,670 - $ -
Natural Gas $149,019 20,790 MMBtu $7.17
TOTAL ENERGY COSTS $1,000,891
RECOMMENDED SAVINGS* $9,072 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,459
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,260
Cost:
$4,730
$4,965 99,302 $2,295 288 - - $4,965
99,302
kWh
$2,295
288
kW-months/year
-
-
MMBtu
02: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$964
Cost:
$45
$791 15,826 $173 22 - - $791
15,826
kWh
$173
22
kW-months/year
-
-
MMBtu
03: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$483
Cost:
$730
$396 7,978 $87 11 - - $396
7,978
kWh
$87
11
kW-months/year
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$235
Cost:
$182
$193 3,856 $42 5 - - $193
3,856
kWh
$42
5
kW-months/year
-
-
MMBtu
05: 2.7291 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS Savings:
$77
Cost:
-
- - - - $77 11 -
-
kWh
-
-
kW-months/year
$77
11
MMBtu
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$54
Cost:
$40
$44 874 $10 1 - - $44
874
kWh
$10
1
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$9,072
Cost:
$5,727
$6,389 127,835 $2,606 327 $77 11 $6,389
127,835
kWh
$2,606
327
kW-months/year
$77
11
MMBtu
TOTAL IMPLEMENTED Savings:
$8,459
Cost:
$4,957
$5,949 118,984 $2,510 315 - - $5,949
118,984
kWh
$2,510
315
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas