IAC Assessment: MU0023
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MU0023
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Michigan State University
Assessment Year 2023
Principal Product Assembly Lines
NAICS 333249 - Other Industrial Machinery Manufacturing
SIC 3569 - General Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 380,000
Annual Production 726,966 Pieces
Production Hrs. Annual 5,304
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $256,048 4,707,032 kWh $0.05
Electricity Demand $252,864 10,700 kW-months/year $23.63
Electricity Fees $744 - $ -
Natural Gas $266,704 25,170 MMBtu $10.60
TOTAL ENERGY COSTS $776,360
RECOMMENDED SAVINGS* $407,021 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $263,985
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,416
Cost:
$480
$1,651 33,019 $1,765 75 - - - - $1,651
33,019
kWh
$1,765
75
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$132,126
Cost:
-
$59,932 1,198,649 $72,194 2,711 - - - - $59,932
1,198,649
kWh
$72,194
2,711
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$517
Cost:
$162
$517 10,333 - - - - - - $517
10,333
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$127,926
Cost:
$136,639
$58,023 1,160,461 $69,903 2,625 - - - - $58,023
1,160,461
kWh
$69,903
2,625
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$504
Cost:
$1,459
$475 9,504 $29 1 - - - - $475
9,504
kWh
$29
1
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$50,220
Cost:
$250,000
$(-14,349) (-286,981) - - $64,569 7,465 - - $(-14,349)
(-286,981)
kWh
-
-
kW-months/year
$64,569
7,465
MMBtu
-
-
$
07: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$7,452
Cost:
$496
$2,327 46,538 - - $5,125 484 - - $2,327
46,538
kWh
-
-
kW-months/year
$5,125
484
MMBtu
-
-
$
08: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$406
Cost:
$50
$124 2,482 - - $282 27 - - $124
2,482
kWh
-
-
kW-months/year
$282
27
MMBtu
-
-
$
09: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$83,300
Cost:
$13,599
$(-106) (-2,127) - - $83,406 7,876 - - $(-106)
(-2,127)
kWh
-
-
kW-months/year
$83,406
7,876
MMBtu
-
-
$
10: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$1,154
Cost:
-
- - - - - - $1,154 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,154
-
$
TOTAL RECOMMENDED Savings:
$407,021
Cost:
$402,885
$108,594 2,171,878 $143,891 5,412 $153,382 15,852 $1,154 - $108,594
2,171,878
kWh
$143,891
5,412
kW-months/year
$153,382
15,852
MMBtu
$1,154
-
$
TOTAL IMPLEMENTED Savings:
$263,985
Cost:
$137,281
$120,123 2,402,462 $143,862 5,411 - - - - $120,123
2,402,462
kWh
$143,862
5,411
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost