IAC Assessment: MU0058
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Michigan State University
Assessment Year 2024
Principal Product iron products
NAICS 331511 - Iron Foundries
SIC 3321 - Gray And Ductile Iron Foundries
Sales $1,000,000-$5,000,000
# of Employees 20
Plant Area (Sq.Ft.) 75,000
Annual Production 1,000,000 Pounds
Production Hrs. Annual 2,080
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $117,427 611,480 kWh $0.19
Electricity Fees $2,667 - $ -
Natural Gas $14,910 1,907 MMBtu $7.82
Other Gas $1,302 1 MMBtu $1,301.56
TOTAL ENERGY COSTS $136,305
RECOMMENDED SAVINGS* $53,792 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$135
Cost:
$370
- - - - $135 17 -
-
kWh
-
-
$
$135
17
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$40,066
Cost:
$1
$40,066 210,873 - - - - $40,066
210,873
kWh
-
-
$
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$239
Cost:
$34
$239 1,261 - - - - $239
1,261
kWh
-
-
$
-
-
MMBtu
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$253
Cost:
-
$253 1,331 - - - - $253
1,331
kWh
-
-
$
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$99
Cost:
$118
$99 520 - - - - $99
520
kWh
-
-
$
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,944
Cost:
$1,620
$4,944 26,018 - - - - $4,944
26,018
kWh
-
-
$
-
-
MMBtu
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,805
Cost:
$870
- - - - $2,805 359 -
-
kWh
-
-
$
$2,805
359
MMBtu
08: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$4,637
Cost:
$623
- - - - $4,637 593 -
-
kWh
-
-
$
$4,637
593
MMBtu
09: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$613
Cost:
-
- - $613 - - - -
-
kWh
$613
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$53,792
Cost:
$3,636
$45,601 240,003 $613 - $7,577 969 $45,601
240,003
kWh
$613
-
$
$7,577
969
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas