IAC logo
IAC Assessment: MU0059
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MU0059
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Michigan State University
Assessment Year 2024
Principal Product Heavy machinery trucks
NAICS 333318 - Other Commercial and Service Industry Machinery Manufacturing
SIC 3537 - Industrial Trucks And Tractors
Sales $10,000,000-$50,000,000
# of Employees 66
Plant Area (Sq.Ft.) 75,000
Annual Production 200 Units
Production Hrs. Annual 2,184
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $28,926 224,560 kWh $0.13
Electricity Fees $4,981 - $ -
Natural Gas $29,054 4,386 MMBtu $6.62
Other Energy $6,204 1 MMBtu $6,204.00
TOTAL ENERGY COSTS $69,165
RECOMMENDED SAVINGS* $22,829 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Energy Electricity Usage Natural Gas Other Energy
$ kWh $ MMBtu $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,763
Cost:
$403
$1,763 13,580 - - - - $1,763
13,580
kWh
-
-
MMBtu
-
-
MMBtu
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$105
Cost:
$600
$105 809 - - - - $105
809
kWh
-
-
MMBtu
-
-
MMBtu
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$4,093
Cost:
$1,951
$(-280) (-2,157) $3,088 467 $1,285 1 $(-280)
(-2,157)
kWh
$3,088
467
MMBtu
$1,285
1
MMBtu
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$814
Cost:
$2,920
- - $814 123 - - -
-
kWh
$814
123
MMBtu
-
-
MMBtu
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,373
Cost:
-
$2,373 18,252 - - - - $2,373
18,252
kWh
-
-
MMBtu
-
-
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$960
Cost:
$2,327
$960 7,390 - - - - $960
7,390
kWh
-
-
MMBtu
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$778
Cost:
$487
$778 5,984 - - - - $778
5,984
kWh
-
-
MMBtu
-
-
MMBtu
08: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$2,664
Cost:
$1,940
- - $2,664 402 - - -
-
kWh
$2,664
402
MMBtu
-
-
MMBtu
09: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$9,279
Cost:
$76,908
$9,279 71,375 - - - - $9,279
71,375
kWh
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$22,829
Cost:
$87,536
$14,978 115,233 $6,567 992 $1,285 1 $14,978
115,233
kWh
$6,567
992
MMBtu
$1,285
1
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Other Energy Electricity Usage Natural Gas Other Energy