IAC Assessment: MUCM06
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MUCM06
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Michigan State University
Assessment Year 2022
Principal Product Automotive Parts Testing
NAICS 541380 - Testing Laboratories
SIC 8734 - Testing Laboratories
Sales <$500,000
# of Employees 750
Plant Area (Sq.Ft.) 250,000
Annual Production 1 Units
Production Hrs. Annual 8,760
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $473,303 8,046,360 kWh $0.06
Electricity Demand $90,094 21,400 kW-months/year $4.21
Electricity Fees $67,959 - $ -
Natural Gas $70,939 9,065 MMBtu $7.83
TOTAL ENERGY COSTS $702,295
RECOMMENDED SAVINGS* $50,021 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,421
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$419
Cost:
$742
- - - - $419 54 -
-
kWh
-
-
kW-months/year
$419
54
MMBtu
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$8,378
Cost:
-
$8,378 139,460 - - - - $8,378
139,460
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$343
Cost:
$934
$313 5,212 $30 7 - - $313
5,212
kWh
$30
7
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,458
Cost:
$12,451
$4,458 74,300 - - - - $4,458
74,300
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$981
Cost:
$900
$981 16,355 - - - - $981
16,355
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$281
Cost:
-
$281 4,680 - - - - $281
4,680
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$1,703
Cost:
$450
- - - - $1,703 218 -
-
kWh
-
-
kW-months/year
$1,703
218
MMBtu
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,882
Cost:
$7,450
$1,715 28,579 $167 40 - - $1,715
28,579
kWh
$167
40
kW-months/year
-
-
MMBtu
09: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$20,603
Cost:
$58,440
$12,727 212,116 $447 106 $7,429 949 $12,727
212,116
kWh
$447
106
kW-months/year
$7,429
949
MMBtu
10: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$537
Cost:
$2,500
$490 8,168 $47 11 - - $490
8,168
kWh
$47
11
kW-months/year
-
-
MMBtu
11: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$10,435
Cost:
$11,466
$3,970 66,171 - - $6,464 826 $3,970
66,171
kWh
-
-
kW-months/year
$6,464
826
MMBtu
TOTAL RECOMMENDED Savings:
$50,021
Cost:
$95,333
$33,313 555,041 $691 164 $16,017 2,046 $33,313
555,041
kWh
$691
164
kW-months/year
$16,017
2,046
MMBtu
TOTAL IMPLEMENTED Savings:
$9,421
Cost:
$1,676
$8,972 149,353 $30 7 $419 54 $8,972
149,353
kWh
$30
7
kW-months/year
$419
54
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas