IAC logo
IAC Assessment: MUCM12
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MUCM12
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Michigan State University
Assessment Year 2023
Principal Product Education Courses
NAICS 611310 - Colleges, Universities, and Professional Schools
SIC 8221 - Colleges And Universities
Sales <$500,000
# of Employees 60
Plant Area (Sq.Ft.) 179,454
Annual Production 100 Units
Production Hrs. Annual 2,295
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $54,536 1,492,894 kWh $0.04
Electricity Demand $70,225 4,551 kW-months/year $15.43
Electricity Fees $15,717 - $ -
Natural Gas $6,090 845 MMBtu $7.21
TOTAL ENERGY COSTS $155,330
RECOMMENDED SAVINGS* $3,668 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $848
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$463
Cost:
$220
$295 7,964 $168 11 - - $295
7,964
kWh
$168
11
kW-months/year
-
-
MMBtu
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$49
Cost:
-
$15 413 $33 2 - - $15
413
kWh
$33
2
kW-months/year
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$166
Cost:
$89
$87 2,342 $79 5 - - $87
2,342
kWh
$79
5
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$848
Cost:
$2,033
$540 14,585 $308 20 - - $540
14,585
kWh
$308
20
kW-months/year
-
-
MMBtu
05: 2.7264 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION Savings:
$1,740
Cost:
$880
- - - - $1,740 242 -
-
kWh
-
-
kW-months/year
$1,740
242
MMBtu
06: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$403
Cost:
$107
- - - - $403 56 -
-
kWh
-
-
kW-months/year
$403
56
MMBtu
TOTAL RECOMMENDED Savings:
$3,668
Cost:
$3,329
$936 25,304 $589 38 $2,143 297 $936
25,304
kWh
$589
38
kW-months/year
$2,143
297
MMBtu
TOTAL IMPLEMENTED Savings:
$848
Cost:
$2,033
$540 14,585 $308 20 - - $540
14,585
kWh
$308
20
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas