IAC logo
IAC Assessment: MUCM17
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MUCM17
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Michigan State University
Assessment Year 2023
Principal Product testing of seats, control modules, latches, doors, and related motor vehicle components
NAICS 336320 - Motor Vehicle Electrical and Electronic Equipment Manufacturing
SIC 5013 - Motor Vehicle Supplies And New Parts
Sales <$500,000
# of Employees 350
Plant Area (Sq.Ft.) 123,000
Annual Production 1 Units
Production Hrs. Annual 3,120
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $147,040 3,210,215 kWh $0.05
Electricity Demand $274,354 8,119 kW-months/year $33.79
Electricity Fees $15,643 - $ -
Natural Gas $31,726 3,312 MMBtu $9.58
TOTAL ENERGY COSTS $468,763
RECOMMENDED SAVINGS* $15,477 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,256
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,804
Cost:
$2,090
$1,804 36,074 - - $1,804
36,074
kWh
-
-
kW-months/year
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,295
Cost:
$791
$1,536 29,599 $1,759 53 $1,536
29,599
kWh
$1,759
53
kW-months/year
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$305
Cost:
$170
$305 5,700 - - $305
5,700
kWh
-
-
kW-months/year
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$117
Cost:
$299
$66 1,157 $51 2 $66
1,157
kWh
$51
2
kW-months/year
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,951
Cost:
$26,757
$5,491 99,322 $4,460 136 $5,491
99,322
kWh
$4,460
136
kW-months/year
06: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$5
Cost:
$16
$5 80 - - $5
80
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$15,477
Cost:
$30,123
$9,207 171,932 $6,270 190 $9,207
171,932
kWh
$6,270
190
kW-months/year
TOTAL IMPLEMENTED Savings:
$10,256
Cost:
$26,927
$5,796 105,022 $4,460 136 $5,796
105,022
kWh
$4,460
136
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand