IAC logo
IAC Assessment: MUCM22
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MUCM22
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Michigan State University
Assessment Year 2024
Principal Product Education
NAICS 611110 - Elementary and Secondary Schools
SIC 8211 - Elementary And Secondary Schools
Sales <$500,000
# of Employees 345
Plant Area (Sq.Ft.) 79,450
Annual Production 100 Units
Production Hrs. Annual 1,400
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $69,719 554,348 kWh $0.13
Electricity Fees $1,962 - $ -
Natural Gas $22,619 5,645 MMBtu $4.01
Other Gas $17,616 1 MMBtu $17,615.97
TOTAL ENERGY COSTS $111,916
RECOMMENDED SAVINGS* $14,130 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Usage Electricity Usage Natural Gas Water Usage
$ kWh $ MMBtu $ Tgal
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,932
Cost:
$1,165
$1,932 14,863 - - - - $1,932
14,863
kWh
-
-
MMBtu
-
-
Tgal
02: 2.7134 USE PHOTOCELL CONTROLS Savings:
$368
Cost:
$772
$368 2,834 - - - - $368
2,834
kWh
-
-
MMBtu
-
-
Tgal
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,716
Cost:
$2,058
$3,716 28,588 - - - - $3,716
28,588
kWh
-
-
MMBtu
-
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,942
Cost:
$3,096
$3,942 30,321 - - - - $3,942
30,321
kWh
-
-
MMBtu
-
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$427
Cost:
$1,050
$427 3,285 - - - - $427
3,285
kWh
-
-
MMBtu
-
-
Tgal
06: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$67
Cost:
$270
$36 280 $30 8 - - $36
280
kWh
$30
8
MMBtu
-
-
Tgal
07: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$284
Cost:
$1,021
$155 1,194 $129 32 - - $155
1,194
kWh
$129
32
MMBtu
-
-
Tgal
08: 3.4151 MINIMIZE WATER USAGE Savings:
$3,394
Cost:
$23,705
- - - - $3,394 113 -
-
kWh
-
-
MMBtu
$3,394
113
Tgal
TOTAL RECOMMENDED Savings:
$14,130
Cost:
$33,137
$10,577 81,365 $159 40 $3,394 113 $10,577
81,365
kWh
$159
40
MMBtu
$3,394
113
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal
Electricity Usage Natural Gas Water Usage Electricity Usage Natural Gas Water Usage