IAC logo
IAC Assessment: MUCM24
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MUCM24
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Michigan State University
Assessment Year 2024
Principal Product Administration
NAICS 921190 - Other General Government Support
SIC 8399 - Social Services, Nec
Sales <$500,000
# of Employees 20
Plant Area (Sq.Ft.) 22,249
Annual Production 1 Units
Production Hrs. Annual 8,760
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $85,466 749,401 kWh $0.11
Electricity Fees $8,740 - $ -
Natural Gas $3,751 882 MMBtu $4.25
Other Gas $4,283 1 MMBtu $4,283.32
TOTAL ENERGY COSTS $102,240
RECOMMENDED SAVINGS* $8,899 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Primary Product Electricity Usage Natural Gas Primary Product
$ kWh $ MMBtu $ $
01: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$419
Cost:
-
- - $419 99 - - -
-
kWh
$419
99
MMBtu
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$735
Cost:
$237
$735 6,685 - - - - $735
6,685
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,029
Cost:
$5,991
$4,029 36,630 - - - - $4,029
36,630
kWh
-
-
MMBtu
-
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,693
Cost:
$3,000
- - $1,693 398 - - -
-
kWh
$1,693
398
MMBtu
-
-
$
05: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$1,516
Cost:
$527
$543 4,937 $973 229 - - $543
4,937
kWh
$973
229
MMBtu
-
-
$
06: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$332
Cost:
$1,021
$119 1,081 $213 50 - - $119
1,081
kWh
$213
50
MMBtu
-
-
$
07: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$175
Cost:
-
- - - - $175 - -
-
kWh
-
-
MMBtu
$175
-
$
TOTAL RECOMMENDED Savings:
$8,899
Cost:
$10,776
$5,426 49,333 $3,298 776 $175 - $5,426
49,333
kWh
$3,298
776
MMBtu
$175
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Primary Product Electricity Usage Natural Gas Primary Product