IAC Assessment: MUWT01
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MUWT01
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Michigan State University
Assessment Year 2023
Principal Product water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 5
Plant Area (Sq.Ft.) 15,800
Annual Production 450,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $63,916 1,537,725 kWh $0.04
Electricity Demand $42,734 2,501 kW-months/year $17.09
Electricity Fees $31,425 - $ -
Natural Gas $10,318 1,160 MMBtu $8.90
TOTAL ENERGY COSTS $148,393
RECOMMENDED SAVINGS* $127,777 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $834
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$70
Cost:
-
$70 1,747 - - - - - - $70
1,747
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$539
Cost:
$2,176
$539 13,477 - - - - - - $539
13,477
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$206
Cost:
$960
$196 4,906 $10 1 - - - - $196
4,906
kWh
$10
1
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$715
Cost:
-
- - - - $715 80 - - -
-
kWh
-
-
kW-months/year
$715
80
MMBtu
-
-
$
05: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$120
Cost:
-
$40 1,003 - - $79 9 - - $40
1,003
kWh
-
-
kW-months/year
$79
9
MMBtu
-
-
$
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$126,128
Cost:
$453,578
- - - - - - $126,128 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$126,128
-
$
TOTAL RECOMMENDED Savings:
$127,777
Cost:
$456,714
$845 21,133 $10 1 $794 89 $126,128 - $845
21,133
kWh
$10
1
kW-months/year
$794
89
MMBtu
$126,128
-
$
TOTAL IMPLEMENTED Savings:
$834
Cost:
-
$40 1,003 - - $794 89 - - $40
1,003
kWh
-
-
kW-months/year
$794
89
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost