IAC logo
IAC Assessment: MUWT06
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MUWT06
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Michigan State University
Assessment Year 2024
Principal Product Treated wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 18
Plant Area (Sq.Ft.) 410,613
Annual Production 4,220,933 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $347,146 4,401,320 kWh $0.08
Electricity Demand $321,309 31,244 kW-months/year $10.28
Electricity Fees $44,151 - $ -
Natural Gas $308,855 48,133 MMBtu $6.42
Other Energy $5,254 1 MMBtu $5,253.83
TOTAL ENERGY COSTS $1,026,714
RECOMMENDED SAVINGS* $40,665 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$669
Cost:
$4,646
$569 7,109 $100 10 - - - - $569
7,109
kWh
$100
10
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$106
Cost:
-
$3 43 $103 10 - - - - $3
43
kWh
$103
10
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$20
Cost:
$20
$17 215 $3 0 - - - - $17
215
kWh
$3
0
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$12,582
Cost:
$8,363
$10,695 133,683 $1,888 184 - - - - $10,695
133,683
kWh
$1,888
184
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,139
Cost:
$563
$491 6,140 $648 63 - - - - $491
6,140
kWh
$648
63
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,226
Cost:
$5,494
$2,391 29,889 $835 81 - - - - $2,391
29,889
kWh
$835
81
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$11,231
Cost:
-
- - - - $11,231 1,749 - - -
-
kWh
-
-
kW-months/year
$11,231
1,749
MMBtu
-
-
$
08: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,263
Cost:
-
- - - - $1,263 197 - - -
-
kWh
-
-
kW-months/year
$1,263
197
MMBtu
-
-
$
09: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$2,478
Cost:
$6,690
- - - - $2,478 386 - - -
-
kWh
-
-
kW-months/year
$2,478
386
MMBtu
-
-
$
10: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$7,951
Cost:
-
- - - - - - $7,951 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$7,951
-
$
TOTAL RECOMMENDED Savings:
$40,665
Cost:
$25,776
$14,166 177,080 $3,576 348 $14,972 2,332 $7,951 - $14,166
177,080
kWh
$3,576
348
kW-months/year
$14,972
2,332
MMBtu
$7,951
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes