Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri-Columbia |
---|---|
Assessment Year | 2007 |
Principal Product | Radiators |
NAICS | 336390 - Other Motor Vehicle Parts Manufacturing |
SIC | 3363 - Aluminum Die-castings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 270 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 11,000 Units |
Production Hrs. Annual | 3,952 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Demand | $422,021 | 8,907,800 | kW-months/year | $0.05 |
Natural Gas | $559,693 | 53,656 | MMBtu | $10.43 |
Fuel Oil #1 | $5,000 | 517 | MMBtu | $9.67 |
TOTAL ENERGY COSTS | $986,714 | |||
RECOMMENDED SAVINGS* | $131,672 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $82,315 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $25,357 Cost: $20,580 |
$25,357 | 147 | - | - |
$25,357 147 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.112 Hardware |
Savings: $75,000 Cost: $78,000 |
- | - | $75,000 | 1 |
- - kWh |
$75,000 1 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS |
Savings: $3,400 Cost: $800 |
- | - | $3,400 | - |
- - kWh |
$3,400 - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.112 Hardware |
Savings: $24,000 Cost: $78,000 |
- | - | $24,000 | 1 |
- - kWh |
$24,000 1 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $3,915 Cost: $3,300 |
- | - | $3,915 | - |
- - kWh |
$3,915 - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $131,672 Cost: $180,680 |
$25,357 | 147 | $106,315 | 2 | $25,357 147 kWh |
$106,315 2 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $82,315 Cost: $82,100 |
- | - | $82,315 | 1 | - - kWh |
$82,315 1 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Electricity Usage | Natural Gas |