IAC Assessment: MZ0047
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0047
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2010
Principal Product lubrication powder
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 60,000
Annual Production 50,000,000 Pounds
Production Hrs. Annual 8,500
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $368,630 4,435,199 kWh $0.08
Natural Gas $123,169 56,733 MMBtu $2.17
TOTAL ENERGY COSTS $491,799
RECOMMENDED SAVINGS* $58,193 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $52,336
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,104
Cost:
$3,000
- - $2,104 653 -
-
kWh
$2,104
653
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$15,170
Cost:
$1,300
$15,170 143,957 - - $15,170
143,957
kWh
-
-
MMBtu
03: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$5,857
Cost:
$80,000
- - $5,857 1,818 -
-
kWh
$5,857
1,818
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20,818
Cost:
$20,818
$20,818 198,985 - - $20,818
198,985
kWh
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$65
Cost:
$180
- - $65 20 -
-
kWh
$65
20
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$929
Cost:
$2,160
- - $929 288 -
-
kWh
$929
288
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$785
Cost:
$400
- - $785 243 -
-
kWh
$785
243
MMBtu
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$225
Cost:
$360
- - $225 70 -
-
kWh
$225
70
MMBtu
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,528
Cost:
$760
$6,528 81,600 - - $6,528
81,600
kWh
-
-
MMBtu
10: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE Savings:
$3,994
Cost:
-
$3,994 49,919 - - $3,994
49,919
kWh
-
-
MMBtu
11: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,718
Cost:
-
$1,718 21,480 - - $1,718
21,480
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$58,193
Cost:
$108,978
$48,228 495,941 $9,965 3,092 $48,228
495,941
kWh
$9,965
3,092
MMBtu
TOTAL IMPLEMENTED Savings:
$52,336
Cost:
$28,978
$48,228 495,941 $4,108 1,274 $48,228
495,941
kWh
$4,108
1,274
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas