IAC logo
IAC Assessment: MZ0050
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0050
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2010
Principal Product magazines, directories, newsletters
NAICS 323111 - Commercial Printing (except Screen and Books)
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 62
Plant Area (Sq.Ft.) 49,800
Annual Production 1,200 Tons
Production Hrs. Annual 5,460
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $130,220 1,871,522 kWh $0.07
Electricity Demand $14,036 6,380 kW-months/year $2.20
TOTAL ENERGY COSTS $144,256
RECOMMENDED SAVINGS* $52,165 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,605
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,053
Cost:
$1,160
$1,913 28,984 $140 6 $1,913
28,984
kWh
$140
6
kW-months/year
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,616
Cost:
-
$2,616 41,527 - - $2,616
41,527
kWh
-
-
kW-months/year
03: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$24,897
Cost:
$5,000
$23,040 384,056 $1,857 84 $23,040
384,056
kWh
$1,857
84
kW-months/year
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$585
Cost:
$6,000
$107 5,621 $478 48 $107
5,621
kWh
$478
48
kW-months/year
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$916
Cost:
$1,000
- - $916 416 -
-
kWh
$916
416
kW-months/year
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,280
Cost:
-
$5,280 80,015 - - $5,280
80,015
kWh
-
-
kW-months/year
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$311
Cost:
$1,250
$311 4,713 - - $311
4,713
kWh
-
-
kW-months/year
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$15,507
Cost:
-
$15,507 258,460 - - $15,507
258,460
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$52,165
Cost:
$14,410
$48,774 803,376 $3,391 554 $48,774
803,376
kWh
$3,391
554
kW-months/year
TOTAL IMPLEMENTED Savings:
$43,605
Cost:
$11,000
$41,270 689,664 $2,335 132 $41,270
689,664
kWh
$2,335
132
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand