IAC logo
IAC Assessment: MZ0051
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0051
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2010
Principal Product Bottled beverages
NAICS 312111 - Soft Drink Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales $5,000,000-$10,000,000
# of Employees 102
Plant Area (Sq.Ft.) 243,000
Annual Production 1 Units
Production Hrs. Annual 6,240
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $712,094 12,716,100 kWh $0.06
Electricity Demand $60,702 29,467 kW-months/year $2.06
Natural Gas $266,435 55,385 MMBtu $4.81
TOTAL ENERGY COSTS $1,039,231
RECOMMENDED SAVINGS* $85,259 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$7,697
Cost:
$1,160
$7,697 128,359 - - $7,697
128,359
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$31,304
Cost:
$73,650
$31,304 522,076 - - $31,304
522,076
kWh
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,823
Cost:
$2,850
$2,823 50,407 - - $2,823
50,407
kWh
-
-
MMBtu
04: 2.6127 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT Savings:
$2,580
Cost:
$1,800
$2,580 46,085 - - $2,580
46,085
kWh
-
-
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,963
Cost:
-
$1,963 35,045 - - $1,963
35,045
kWh
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,408
Cost:
-
$4,408 78,712 - - $4,408
78,712
kWh
-
-
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$544
Cost:
$400
$544 9,720 - - $544
9,720
kWh
-
-
MMBtu
08: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$1,123
Cost:
$800
- - $1,123 246 -
-
kWh
$1,123
246
MMBtu
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$32,817
Cost:
$10,000
- - $32,817 7,197 -
-
kWh
$32,817
7,197
MMBtu
TOTAL RECOMMENDED Savings:
$85,259
Cost:
$90,660
$51,319 870,404 $33,940 7,443 $51,319
870,404
kWh
$33,940
7,443
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas