IAC logo
IAC Assessment: MZ0052
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0052
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2010
Principal Product Uncoated virgin polyester rolls, solvents, etc
NAICS 322220 - Paper Bag and Coated and Treated Paper Manufacturing
SIC 3497 - Metal Foil And Leaf
Sales $10,000,000-$50,000,000
# of Employees 36
Plant Area (Sq.Ft.) 80,000
Annual Production 62,856,800 Pieces
Production Hrs. Annual 6,600
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $409,856 5,841,000 kWh $0.07
Natural Gas $183,822 25,584 MMBtu $7.19
TOTAL ENERGY COSTS $593,678
RECOMMENDED SAVINGS* $48,786 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,319
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,921
Cost:
$1,160
$3,541 50,590 $1,380 159 - - $3,541
50,590
kWh
$1,380
159
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,855
Cost:
$16,700
$5,594 79,926 $1,261 145 - - $5,594
79,926
kWh
$1,261
145
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,361
Cost:
$18,360
$12,535 179,070 $2,826 326 - - $12,535
179,070
kWh
$2,826
326
kW-months/year
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$9,103
Cost:
$8,984
- - - - $9,103 - -
-
kWh
-
-
kW-months/year
$9,103
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,546
Cost:
$1,000
$10,180 145,428 $2,366 273 - - $10,180
145,428
kWh
$2,366
273
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$48,786
Cost:
$46,204
$31,850 455,014 $7,833 903 $9,103 - $31,850
455,014
kWh
$7,833
903
kW-months/year
$9,103
-
$
TOTAL IMPLEMENTED Savings:
$31,319
Cost:
$44,044
$18,129 258,996 $4,087 471 $9,103 - $18,129
258,996
kWh
$4,087
471
kW-months/year
$9,103
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees