IAC logo
IAC Assessment: MZ0067
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0067
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2011
Principal Product electronic/machined units
NAICS 333993 - Packaging Machinery Manufacturing
SIC 3565 - Packaging Machinery
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 75,000
Annual Production 25,000 Pieces
Production Hrs. Annual 4,862
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $148,100 2,101,500 kWh $0.07
Electricity Demand $11,081 6,156 kW-months/year $1.80
Natural Gas $15,326 2,545 MMBtu $6.02
TOTAL ENERGY COSTS $174,507
RECOMMENDED SAVINGS* $49,787 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,468
Cost:
$17,620
$7,991 107,343 $477 200 - - $7,991
107,343
kWh
$477
200
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$24,071
Cost:
$26,900
$23,335 238,637 $736 350 - - $23,335
238,637
kWh
$736
350
kW-months/year
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$672
Cost:
$230
$672 9,600 - - - - $672
9,600
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,702
Cost:
$850
$9,702 130,426 - - - - $9,702
130,426
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$5,674
Cost:
-
$3,020 43,143 - - $2,654 441 $3,020
43,143
kWh
-
-
kW-months/year
$2,654
441
MMBtu
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,200
Cost:
$2,200
$1,200 17,142 - - - - $1,200
17,142
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$49,787
Cost:
$47,800
$45,920 546,291 $1,213 550 $2,654 441 $45,920
546,291
kWh
$1,213
550
kW-months/year
$2,654
441
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas