IAC logo
IAC Assessment: MZ0073
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0073
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2011
Principal Product laminated paper products
NAICS 323111 - Commercial Printing (except Screen and Books)
SIC 2759 - Commercial Printing, Nec
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 75,000
Annual Production 250 Tons
Production Hrs. Annual 6,000
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $159,763 2,299,200 kWh $0.07
Natural Gas $15,326 2,545 MMBtu $6.02
TOTAL ENERGY COSTS $175,089
RECOMMENDED SAVINGS* $65,397 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,904
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,600
Cost:
$12,500
$12,600 166,900 $12,600
166,900
kWh
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,500
Cost:
$15,300
$15,500 159,468 $15,500
159,468
kWh
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$638
Cost:
$760
$638 9,120 $638
9,120
kWh
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$9,393
Cost:
$4,500
$9,393 135,549 $9,393
135,549
kWh
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,698
Cost:
$850
$1,698 24,618 $1,698
24,618
kWh
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$16,120
Cost:
-
$16,120 220,812 $16,120
220,812
kWh
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$7,750
Cost:
-
$7,750 79,572 $7,750
79,572
kWh
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,698
Cost:
-
$1,698 24,618 $1,698
24,618
kWh
TOTAL RECOMMENDED Savings:
$65,397
Cost:
$33,910
$65,397 820,657 $65,397
820,657
kWh
TOTAL IMPLEMENTED Savings:
$27,904
Cost:
$1,610
$27,904 358,740 $27,904
358,740
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage