IAC Assessment: MZ0104
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0104
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2012
Principal Product steel pipes
NAICS 331210 - Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3317 - Steel Pipe And Tubes
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 350,000
Annual Production 17,000 Tons
Production Hrs. Annual 8,064
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,369,061 67,657,621 kWh $0.04
Electricity Demand $1,112,434 125,841 kW-months/year $8.84
Natural Gas $172,798 33,987 MMBtu $5.08
TOTAL ENERGY COSTS $3,654,293
RECOMMENDED SAVINGS* $305,568 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $126,615
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$34,398
Cost:
$26,000
$25,021 712,858 $9,377 1,061 $25,021
712,858
kWh
$9,377
1,061
kW-months/year
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,309
Cost:
$1,750
$2,309 65,797 - - $2,309
65,797
kWh
-
-
kW-months/year
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,102
Cost:
-
$2,102 61,320 - - $2,102
61,320
kWh
-
-
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,616
Cost:
$30,000
$5,616 160,000 - - $5,616
160,000
kWh
-
-
kW-months/year
05: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$3,111
Cost:
$900
$3,111 88,630 - - $3,111
88,630
kWh
-
-
kW-months/year
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$7,299
Cost:
$1,160
$5,309 151,247 $1,990 225 $5,309
151,247
kWh
$1,990
225
kW-months/year
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,461
Cost:
$850
$1,078 30,712 $383 43 $1,078
30,712
kWh
$383
43
kW-months/year
08: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR Savings:
$152,137
Cost:
$150,000
$110,214 3,140,012 $41,923 4,742 $110,214
3,140,012
kWh
$41,923
4,742
kW-months/year
09: 2.2428 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC Savings:
$13,645
Cost:
$25,000
$10,109 288,000 $3,536 400 $10,109
288,000
kWh
$3,536
400
kW-months/year
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$83,490
Cost:
$112,500
$83,490 2,378,640 - - $83,490
2,378,640
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$305,568
Cost:
$348,160
$248,359 7,077,216 $57,209 6,471 $248,359
7,077,216
kWh
$57,209
6,471
kW-months/year
TOTAL IMPLEMENTED Savings:
$126,615
Cost:
$169,400
$117,238 3,340,128 $9,377 1,061 $117,238
3,340,128
kWh
$9,377
1,061
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand