Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri-Columbia |
---|---|
Assessment Year | 2012 |
Principal Product | solvents, resins, monomers |
NAICS | 236210 - Industrial Building Construction |
SIC | 2821 - Plastics Materials And Resins |
Sales | $10,000,000-$50,000,000 |
# of Employees | 272 |
Plant Area (Sq.Ft.) | 128,119 |
Annual Production | 350 Tons |
Production Hrs. Annual | 3,650 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $473,476 | 7,066,804 | kWh | $0.07 |
Electricity Demand | $9 | 1 | kW-months/year | $8.50 |
Natural Gas | $114,281 | 10,446 | MMBtu | $10.94 |
TOTAL ENERGY COSTS | $590,054 | |||
RECOMMENDED SAVINGS* | $211,394 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $65,583 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $12,823 Cost: $28,300 |
$9,049 | 135,057 | $3,774 | 444 | - | - | - | - |
$9,049 135,057 kWh |
$3,774 444 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $42,257 Cost: $4,645 |
$42,257 | 630,720 | - | - | - | - | - | - |
$42,257 630,720 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $12,339 Cost: $13,500 |
- | - | - | - | $12,339 | 1,128 | - | - |
- - kWh |
- - kW-months/year |
$12,339 1,128 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6127 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT |
Savings: $8,215 Cost: $52,200 |
$8,215 | 122,612 | - | - | - | - | - | - |
$8,215 122,612 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $58,099 Cost: $39,870 |
$58,099 | 867,153 | - | - | - | - | - | - |
$58,099 867,153 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2692 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER |
Savings: $42,514 Cost: $318,000 |
$34,248 | 511,165 | - | - | $8,266 | 756 | - | - |
$34,248 511,165 kWh |
- - kW-months/year |
$8,266 756 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $920 Cost: $1,160 |
$649 | 9,688 | $271 | 32 | - | - | - | - |
$649 9,688 kWh |
$271 32 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $30,462 Cost: $115,696 |
$21,496 | 320,835 | $8,966 | 1,055 | - | - | - | - |
$21,496 320,835 kWh |
$8,966 1,055 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $2,288 Cost: $2,000 |
- | - | - | - | - | - | $2,288 | 375,000 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,288 375,000 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,476 Cost: $1,140 |
$1,476 | 22,035 | - | - | - | - | - | - |
$1,476 22,035 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY |
Savings: $1 Cost: $1 |
$1 | 1 | - | - | - | - | - | - |
$1 1 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $211,394 Cost: $576,512 |
$175,490 | 2,619,266 | $13,011 | 1,531 | $20,605 | 1,884 | $2,288 | 375,000 | $175,490 2,619,266 kWh |
$13,011 1,531 kW-months/year |
$20,605 1,884 MMBtu |
$2,288 375,000 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $65,583 Cost: $87,145 |
$59,521 | 888,389 | $3,774 | 444 | - | - | $2,288 | 375,000 | $59,521 888,389 kWh |
$3,774 444 kW-months/year |
- - MMBtu |
$2,288 375,000 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal |