IAC Assessment: MZ0106
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0106
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2012
Principal Product industrial batteries
NAICS 335911 - Storage Battery Manufacturing
SIC 3691 - Storage Batteries
Sales $50,000,000-$100,000,000
# of Employees 485
Plant Area (Sq.Ft.) 512,000
Annual Production 75,000 Pieces
Production Hrs. Annual 8,760
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,722,038 50,755,282 kWh $0.05
Electricity Demand $466,560 78,459 kW-months/year $5.95
Natural Gas $463,405 176,721 MMBtu $2.62
TOTAL ENERGY COSTS $3,652,003
RECOMMENDED SAVINGS* $312,566 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $62,851
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$55,068
Cost:
$26,420
$47,982 896,866 $7,086 1,229 $47,982
896,866
kWh
$7,086
1,229
kW-months/year
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$27,548
Cost:
$31,400
$24,003 448,652 $3,545 615 $24,003
448,652
kWh
$3,545
615
kW-months/year
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,174
Cost:
$1,750
$5,174 96,710 - - $5,174
96,710
kWh
-
-
kW-months/year
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$87,874
Cost:
$6,500
$87,874 1,642,500 - - $87,874
1,642,500
kWh
-
-
kW-months/year
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$20,969
Cost:
$3,000
$20,969 391,940 - - $20,969
391,940
kWh
-
-
kW-months/year
06: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE Savings:
$7,267
Cost:
$25,000
$7,267 136,341 - - $7,267
136,341
kWh
-
-
kW-months/year
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,893
Cost:
$850
$1,643 30,712 $250 43 $1,643
30,712
kWh
$250
43
kW-months/year
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$18,537
Cost:
$1,200
$16,152 301,900 $2,385 414 $16,152
301,900
kWh
$2,385
414
kW-months/year
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$88,236
Cost:
$30,000
$88,236 1,649,253 - - $88,236
1,649,253
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$312,566
Cost:
$126,120
$299,300 5,594,874 $13,266 2,301 $299,300
5,594,874
kWh
$13,266
2,301
kW-months/year
TOTAL IMPLEMENTED Savings:
$62,851
Cost:
$62,000
$59,056 1,104,355 $3,795 658 $59,056
1,104,355
kWh
$3,795
658
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand