IAC Assessment: MZ0108
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0108
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2013
Principal Product Extruded Tubing and Rubber
NAICS 326150 - Urethane and Other Foam Product (except Polystyrene) Manufacturing
SIC 3086 - Plastics Foam Products
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 60,000
Annual Production 3,825,000 Pounds
Production Hrs. Annual 6,240
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $187,201 2,638,507 kWh $0.07
Electricity Demand $21,680 8,235 kW-months/year $2.63
Electricity Fees $2,337 - $ -
Natural Gas $10,075 1,155 MMBtu $8.72
TOTAL ENERGY COSTS $221,293
RECOMMENDED SAVINGS* $18,585 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,473
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$4,938
Cost:
-
$4,938 69,650 - - - - $4,938
69,650
kWh
-
-
kW-months/year
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,161
Cost:
$4,018
$4,161 58,693 - - - - $4,161
58,693
kWh
-
-
kW-months/year
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,978
Cost:
$1,256
$2,978 41,998 - - - - $2,978
41,998
kWh
-
-
kW-months/year
-
-
$
04: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$2,074
Cost:
$10,000
$2,074 29,250 - - - - $2,074
29,250
kWh
-
-
kW-months/year
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,196
Cost:
$3,512
$2,043 28,815 $153 58 - - $2,043
28,815
kWh
$153
58
kW-months/year
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,354
Cost:
$1,090
$1,502 21,181 $108 41 $(-256) - $1,502
21,181
kWh
$108
41
kW-months/year
$(-256)
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$423
Cost:
$360
$397 5,604 $26 10 - - $397
5,604
kWh
$26
10
kW-months/year
-
-
$
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$342
Cost:
$200
$318 4,480 $24 9 - - $318
4,480
kWh
$24
9
kW-months/year
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$119
Cost:
$32
$111 1,561 $8 3 - - $111
1,561
kWh
$8
3
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$18,585
Cost:
$20,468
$18,522 261,232 $319 121 $(-256) - $18,522
261,232
kWh
$319
121
kW-months/year
$(-256)
-
$
TOTAL IMPLEMENTED Savings:
$1,473
Cost:
$1,122
$1,613 22,742 $116 44 $(-256) - $1,613
22,742
kWh
$116
44
kW-months/year
$(-256)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes