Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri-Columbia |
---|---|
Assessment Year | 2013 |
Principal Product | automotive braking systems |
NAICS | 336340 - Motor Vehicle Brake System Manufacturing |
SIC | 3714 - Motor Vehicle Parts And Accessories |
Sales | $50,000,000-$100,000,000 |
# of Employees | 270 |
Plant Area (Sq.Ft.) | 110,000 |
Annual Production | 2,374,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $153,204 | 2,554,942 | kWh | $0.06 |
Electricity Demand | $56,907 | 7,732 | kW-months/year | $7.36 |
Natural Gas | $20,391 | 2,043 | MMBtu | $9.98 |
TOTAL ENERGY COSTS | $230,502 | |||
RECOMMENDED SAVINGS* | $70,522 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $24,016 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,890 Cost: $900 |
$3,127 | 53,914 | $763 | 104 | - | - |
$3,127 53,914 kWh |
$763 104 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $10,497 Cost: $15,000 |
- | - | - | - | $10,497 | 1,051 |
- - kWh |
- - kW-months/year |
$10,497 1,051 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,319 Cost: - |
$3,319 | 55,498 | - | - | - | - |
$3,319 55,498 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $18,532 Cost: $45,540 |
$14,985 | 250,585 | $3,547 | 482 | - | - |
$14,985 250,585 kWh |
$3,547 482 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7229 AIR CONDITION ONLY SPACE NECESSARY |
Savings: $32,690 Cost: $12,531 |
$24,361 | 407,376 | $8,329 | 1,132 | - | - |
$24,361 407,376 kWh |
$8,329 1,132 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4227 USE COMPRESSOR AIR FILTERS |
Savings: $1,594 Cost: $850 |
$1,289 | 21,556 | $305 | 41 | - | - |
$1,289 21,556 kWh |
$305 41 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $70,522 Cost: $74,821 |
$47,081 | 788,929 | $12,944 | 1,759 | $10,497 | 1,051 | $47,081 788,929 kWh |
$12,944 1,759 kW-months/year |
$10,497 1,051 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $24,016 Cost: $47,290 |
$19,401 | 326,055 | $4,615 | 627 | - | - | $19,401 326,055 kWh |
$4,615 627 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |