Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri-Columbia |
---|---|
Assessment Year | 2013 |
Principal Product | Stainless Steel Tanks |
NAICS | 332420 - Metal Tank (Heavy Gauge) Manufacturing |
SIC | 3443 - Fabricated Plate Work (boiler Shops) |
Sales | $100,000,000-$500,000,000 |
# of Employees | 568 |
Plant Area (Sq.Ft.) | 750,000 |
Annual Production | 35,000,000 Pounds |
Production Hrs. Annual | 8,400 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $373,751 | 8,797,752 | kWh | $0.04 |
Electricity Demand | $250,304 | 23,411 | kW-months/year | $10.69 |
Natural Gas | $179,547 | 32,274 | MMBtu | $5.56 |
TOTAL ENERGY COSTS | $803,602 | |||
RECOMMENDED SAVINGS* | $105,409 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $63,294 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $53,250 Cost: $61,965 |
$39,171 | 922,111 | $14,079 | 1,317 | - | - | - | - |
$39,171 922,111 kWh |
$14,079 1,317 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $22,321 Cost: $12,640 |
$15,704 | 369,676 | $6,617 | 619 | - | - | - | - |
$15,704 369,676 kWh |
$6,617 619 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $10,044 Cost: $2,500 |
- | - | - | - | $10,044 | 1,855 | - | - |
- - kWh |
- - kW-months/year |
$10,044 1,855 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,322 Cost: $1,333 |
$4,693 | 110,477 | $1,689 | 158 | - | - | $(-60) | - |
$4,693 110,477 kWh |
$1,689 158 kW-months/year |
- - MMBtu |
$(-60) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $5,688 Cost: $16,575 |
- | - | - | - | $5,688 | 1,023 | - | - |
- - kWh |
- - kW-months/year |
$5,688 1,023 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $4,932 Cost: $2,000 |
$3,628 | 85,400 | $1,304 | 122 | - | - | - | - |
$3,628 85,400 kWh |
$1,304 122 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $2,852 Cost: $1,614 |
- | - | - | - | $2,852 | 513 | - | - |
- - kWh |
- - kW-months/year |
$2,852 513 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $105,409 Cost: $98,627 |
$63,196 | 1,487,664 | $23,689 | 2,216 | $18,584 | 3,391 | $(-60) | - | $63,196 1,487,664 kWh |
$23,689 2,216 kW-months/year |
$18,584 3,391 MMBtu |
$(-60) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $63,294 Cost: $64,465 |
$39,171 | 922,111 | $14,079 | 1,317 | $10,044 | 1,855 | - | - | $39,171 922,111 kWh |
$14,079 1,317 kW-months/year |
$10,044 1,855 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |