IAC logo
IAC Assessment: MZ0134
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0134
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2013
Principal Product Stainless Steel Tanks
NAICS 332420 - Metal Tank (Heavy Gauge) Manufacturing
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $100,000,000-$500,000,000
# of Employees 568
Plant Area (Sq.Ft.) 750,000
Annual Production 35,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $373,751 8,797,752 kWh $0.04
Electricity Demand $250,304 23,411 kW-months/year $10.69
Natural Gas $179,547 32,274 MMBtu $5.56
TOTAL ENERGY COSTS $803,602
RECOMMENDED SAVINGS* $105,409 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $63,294
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$53,250
Cost:
$61,965
$39,171 922,111 $14,079 1,317 - - - - $39,171
922,111
kWh
$14,079
1,317
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$22,321
Cost:
$12,640
$15,704 369,676 $6,617 619 - - - - $15,704
369,676
kWh
$6,617
619
kW-months/year
-
-
MMBtu
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$10,044
Cost:
$2,500
- - - - $10,044 1,855 - - -
-
kWh
-
-
kW-months/year
$10,044
1,855
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,322
Cost:
$1,333
$4,693 110,477 $1,689 158 - - $(-60) - $4,693
110,477
kWh
$1,689
158
kW-months/year
-
-
MMBtu
$(-60)
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$5,688
Cost:
$16,575
- - - - $5,688 1,023 - - -
-
kWh
-
-
kW-months/year
$5,688
1,023
MMBtu
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,932
Cost:
$2,000
$3,628 85,400 $1,304 122 - - - - $3,628
85,400
kWh
$1,304
122
kW-months/year
-
-
MMBtu
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,852
Cost:
$1,614
- - - - $2,852 513 - - -
-
kWh
-
-
kW-months/year
$2,852
513
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$105,409
Cost:
$98,627
$63,196 1,487,664 $23,689 2,216 $18,584 3,391 $(-60) - $63,196
1,487,664
kWh
$23,689
2,216
kW-months/year
$18,584
3,391
MMBtu
$(-60)
-
$
TOTAL IMPLEMENTED Savings:
$63,294
Cost:
$64,465
$39,171 922,111 $14,079 1,317 $10,044 1,855 - - $39,171
922,111
kWh
$14,079
1,317
kW-months/year
$10,044
1,855
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes