Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri-Columbia |
---|---|
Assessment Year | 2014 |
Principal Product | Water-based latex |
NAICS | 325211 - Plastics Material and Resin Manufacturing |
SIC | 2821 - Plastics Materials And Resins |
Sales | $100,000,000-$500,000,000 |
# of Employees | 51 |
Plant Area (Sq.Ft.) | 180,000 |
Annual Production | 180,000,000 Pounds |
Production Hrs. Annual | 8,400 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $323,777 | 5,553,636 | kWh | $0.06 |
Electricity Demand | $92,112 | 8,847 | kW-months/year | $10.41 |
Natural Gas | $417,377 | 74,166 | MMBtu | $5.63 |
TOTAL ENERGY COSTS | $842,260 | |||
RECOMMENDED SAVINGS* | $170,271 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $41,019 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $27,719 Cost: $74,400 |
$22,086 | 378,840 | $5,633 | 541 | - | - |
$22,086 378,840 kWh |
$5,633 541 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $7,000 Cost: $15,000 |
- | - | - | - | $7,000 | 1,244 |
- - kWh |
- - kW-months/year |
$7,000 1,244 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1224 REPLACE BOILER |
Savings: $32,000 Cost: $65,000 |
- | - | - | - | $32,000 | 5,686 |
- - kWh |
- - kW-months/year |
$32,000 5,686 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR |
Savings: $47,644 Cost: $117,000 |
$37,953 | 651,000 | $9,691 | 930 | - | - |
$37,953 651,000 kWh |
$9,691 930 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD |
Savings: $13,436 Cost: $24,000 |
$906 | 15,545 | - | - | $12,530 | 2,226 |
$906 15,545 kWh |
- - kW-months/year |
$12,530 2,226 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.1161 ELIMINATE/REDUCE AN OPERATION |
Savings: $7,727 Cost: - |
$6,556 | 112,500 | $1,171 | 112 | - | - |
$6,556 112,500 kWh |
$1,171 112 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $3,778 Cost: $7,000 |
- | - | - | - | $3,778 | 671 |
- - kWh |
- - kW-months/year |
$3,778 671 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $13,300 Cost: $5,000 |
$10,593 | 181,691 | $2,707 | 260 | - | - |
$10,593 181,691 kWh |
$2,707 260 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $6,495 Cost: - |
$2,217 | 38,020 | $593 | 57 | $3,685 | 649 |
$2,217 38,020 kWh |
$593 57 kW-months/year |
$3,685 649 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE |
Savings: $11,172 Cost: $24,000 |
- | - | - | - | $11,172 | 1,985 |
- - kWh |
- - kW-months/year |
$11,172 1,985 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $170,271 Cost: $331,400 |
$80,311 | 1,377,596 | $19,795 | 1,900 | $70,165 | 12,461 | $80,311 1,377,596 kWh |
$19,795 1,900 kW-months/year |
$70,165 12,461 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $41,019 Cost: $79,400 |
$32,679 | 560,531 | $8,340 | 801 | - | - | $32,679 560,531 kWh |
$8,340 801 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |