IAC Assessment: MZ0169
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0169
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2015
Principal Product machined parts for OEM
NAICS 332618 - Other Fabricated Wire Product Manufacturing
SIC 2542 - Partitions And Fixtures, Except Wood
Sales $1,000,000-$5,000,000
# of Employees 16
Plant Area (Sq.Ft.) 50,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 3,500
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $134,751 1,523,694 kWh $0.09
Electricity Demand $19,296 7,200 kW-months/year $2.68
Natural Gas $8,135 868 MMBtu $9.37
TOTAL ENERGY COSTS $162,182
RECOMMENDED SAVINGS* $5,018 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,809
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,001
Cost:
$600
$906 10,290 $95 35 - - $906
10,290
kWh
$95
35
kW-months/year
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$209
Cost:
$300
$189 2,152 $20 7 - - $189
2,152
kWh
$20
7
kW-months/year
-
-
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$154
Cost:
-
- - - - $154 16 -
-
kWh
-
-
kW-months/year
$154
16
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,080
Cost:
$7,000
$1,883 21,403 $197 73 - - $1,883
21,403
kWh
$197
73
kW-months/year
-
-
MMBtu
05: 4.512 CONDENSE OPERATION INTO ONE BUILDING Savings:
$1,574
Cost:
-
$1,425 16,188 $149 56 - - $1,425
16,188
kWh
$149
56
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$5,018
Cost:
$7,900
$4,403 50,033 $461 171 $154 16 $4,403
50,033
kWh
$461
171
kW-months/year
$154
16
MMBtu
TOTAL IMPLEMENTED Savings:
$4,809
Cost:
$7,600
$4,214 47,881 $441 164 $154 16 $4,214
47,881
kWh
$441
164
kW-months/year
$154
16
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas