IAC logo
IAC Assessment: MZ0171
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0171
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2015
Principal Product plastic cards and holders
NAICS 323111 - Commercial Printing (except Screen and Books)
SIC 2759 - Commercial Printing, Nec
Sales $5,000,000-$10,000,000
# of Employees 35
Plant Area (Sq.Ft.) 20,000
Annual Production 350,000,000 Pieces
Production Hrs. Annual 5,950
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $97,081 1,120,728 kWh $0.09
Electricity Demand $16,512 5,711 kW-months/year $2.89
Natural Gas $4,464 427 MMBtu $10.45
TOTAL ENERGY COSTS $118,057
RECOMMENDED SAVINGS* $17,469 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$1,588
Cost:
-
- - - - $1,588 152 -
-
kWh
-
-
kW-months/year
$1,588
152
MMBtu
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$8,781
Cost:
-
$7,739 89,343 $645 223 $397 38 $7,739
89,343
kWh
$645
223
kW-months/year
$397
38
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,759
Cost:
$3,900
$1,649 19,040 $110 38 - - $1,649
19,040
kWh
$110
38
kW-months/year
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,783
Cost:
$880
$2,783 32,125 - - - - $2,783
32,125
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,558
Cost:
$870
$2,396 27,659 $162 56 - - $2,396
27,659
kWh
$162
56
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$17,469
Cost:
$5,650
$14,567 168,167 $917 317 $1,985 190 $14,567
168,167
kWh
$917
317
kW-months/year
$1,985
190
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas