IAC logo
IAC Assessment: MZ0182
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0182
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2015
Principal Product Processed Bacon and Ham
NAICS 311612 - Meat Processed from Carcasses
SIC 2013 - Sausages And Other Prepared Meats
Sales $100,000,000-$500,000,000
# of Employees 350
Plant Area (Sq.Ft.) 180,000
Annual Production 41,800 Tons
Production Hrs. Annual 8,736
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $614,339 8,390,975 kWh $0.07
Electricity Demand $35,584 15,133 kW-months/year $2.35
Natural Gas $332,286 75,870 MMBtu $4.38
TOTAL ENERGY COSTS $982,208
RECOMMENDED SAVINGS* $70,634 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$2,344
Cost:
$5,600
$2,344 33,482 - - $2,344
33,482
kWh
-
-
kW-months/year
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$9,859
Cost:
$1,100
$9,273 132,469 $586 249 $9,273
132,469
kWh
$586
249
kW-months/year
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,623
Cost:
-
$5,623 80,330 - - $5,623
80,330
kWh
-
-
kW-months/year
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,921
Cost:
$15,600
$12,351 176,441 $570 242 $12,351
176,441
kWh
$570
242
kW-months/year
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,985
Cost:
$1,740
$1,985 28,361 - - $1,985
28,361
kWh
-
-
kW-months/year
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$37,902
Cost:
$42,400
$37,902 541,462 - - $37,902
541,462
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$70,634
Cost:
$66,440
$69,478 992,545 $1,156 491 $69,478
992,545
kWh
$1,156
491
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand