IAC logo
IAC Assessment: MZ0185
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0185
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2015
Principal Product dog and cat food
NAICS 311111 - Dog and Cat Food Manufacturing
SIC 2047 - Dog And Cat Food
Sales $100,000,000-$500,000,000
# of Employees 450
Plant Area (Sq.Ft.) 243,000
Annual Production 95,000,000 Pieces
Production Hrs. Annual 5,300
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,234,035 28,921,821 kWh $0.04
Electricity Demand $770,140 65,469 kW-months/year $11.76
Natural Gas $527,629 91,458 MMBtu $5.77
TOTAL ENERGY COSTS $2,531,804
RECOMMENDED SAVINGS* $593,399 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $40,103
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$444,193
Cost:
$2,686,745
$204,219 4,786,247 $239,974 20,400 - - $204,219
4,786,247
kWh
$239,974
20,400
kW-months/year
-
-
MMBtu
02: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$4,593
Cost:
$7,228
$3,317 77,729 $1,276 109 - - $3,317
77,729
kWh
$1,276
109
kW-months/year
-
-
MMBtu
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$16,223
Cost:
-
$3,893 91,245 $1,553 132 $10,777 1,868 $3,893
91,245
kWh
$1,553
132
kW-months/year
$10,777
1,868
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,296
Cost:
$9,730
$3,261 76,426 $2,035 173 - - $3,261
76,426
kWh
$2,035
173
kW-months/year
-
-
MMBtu
05: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$92,880
Cost:
$450,000
- - $92,880 7,914 - - -
-
kWh
$92,880
7,914
kW-months/year
-
-
MMBtu
06: 2.7134 USE PHOTOCELL CONTROLS Savings:
$30,214
Cost:
$15,000
$30,214 708,120 - - - - $30,214
708,120
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$593,399
Cost:
$3,168,703
$244,904 5,739,767 $337,718 28,728 $10,777 1,868 $244,904
5,739,767
kWh
$337,718
28,728
kW-months/year
$10,777
1,868
MMBtu
TOTAL IMPLEMENTED Savings:
$40,103
Cost:
$31,958
$36,792 862,275 $3,311 282 - - $36,792
862,275
kWh
$3,311
282
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas