IAC logo
IAC Assessment: MZ0189
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0189
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2015
Principal Product Tires
NAICS 326211 - Tire Manufacturing (except Retreading)
SIC 3011 - Tires And Inner Tubes
Sales $10,000,000-$50,000,000
# of Employees 45
Plant Area (Sq.Ft.) 162,000
Annual Production 250,000 Pieces
Production Hrs. Annual 3,600
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $81,716 1,481,607 kWh $0.06
Electricity Demand $49,063 6,734 kW-months/year $7.29
TOTAL ENERGY COSTS $130,779
RECOMMENDED SAVINGS* $30,594 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,220
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$18,361
Cost:
-
- - $18,361 2,520 - - -
-
kWh
$18,361
2,520
kW-months/year
-
-
$
02: 3.7212 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) Savings:
$4,178
Cost:
$8,000
$3,406 61,700 $452 62 $320 - $3,406
61,700
kWh
$452
62
kW-months/year
$320
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,216
Cost:
$2,500
$844 15,187 $372 51 - - $844
15,187
kWh
$372
51
kW-months/year
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,865
Cost:
$880
$1,297 23,499 $568 78 - - $1,297
23,499
kWh
$568
78
kW-months/year
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,835
Cost:
$5,500
$3,085 55,884 $750 103 - - $3,085
55,884
kWh
$750
103
kW-months/year
-
-
$
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,139
Cost:
-
$964 17,471 $175 24 - - $964
17,471
kWh
$175
24
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$30,594
Cost:
$16,880
$9,596 173,741 $20,678 2,838 $320 - $9,596
173,741
kWh
$20,678
2,838
kW-months/year
$320
-
$
TOTAL IMPLEMENTED Savings:
$4,220
Cost:
$3,380
$3,105 56,157 $1,115 153 - - $3,105
56,157
kWh
$1,115
153
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost