Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2015
Principal Product Turbine Engines
NAICS 333611 - Turbine and Turbine Generator Set Units Manufacturing
SIC 3511 - Turbines And Turbine Generator Sets
Sales $10,000,000-$50,000,000
# of Employees 175
Plant Area (Sq.Ft.) 56,000
Annual Production 500 Pieces
Production Hrs. Annual 4,200
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $235,306 2,643,600 kWh $0.09
Electricity Demand $50,964 12,583 kW-months/year $4.05
Natural Gas $30,731 3,950 MMBtu $7.78
TOTAL ENERGY COSTS $317,001
RECOMMENDED SAVINGS* $58,582 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,360
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$10,108
Cost:
$26,750
$(-694) (-7,800) $(-316) (-78) $11,118 1,429 $(-694)
(-7,800)
kWh
$(-316)
(-78)
kW-months/year
$11,118
1,429
MMBtu
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$16,902
Cost:
-
$15,035 168,913 $1,867 461 - - $15,035
168,913
kWh
$1,867
461
kW-months/year
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,474
Cost:
$3,500
$2,190 24,608 $284 70 - - $2,190
24,608
kWh
$284
70
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,535
Cost:
$920
$3,130 35,170 $405 100 - - $3,130
35,170
kWh
$405
100
kW-months/year
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,229
Cost:
$3,500
$5,229 58,748 - - - - $5,229
58,748
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,328
Cost:
$2,000
$3,113 34,975 $215 53 - - $3,113
34,975
kWh
$215
53
kW-months/year
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,548
Cost:
$22,425
$5,795 65,100 $753 186 - - $5,795
65,100
kWh
$753
186
kW-months/year
-
-
MMBtu
08: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$10,458
Cost:
-
$10,458 117,495 - - - - $10,458
117,495
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$58,582
Cost:
$59,095
$44,256 497,209 $3,208 792 $11,118 1,429 $44,256
497,209
kWh
$3,208
792
kW-months/year
$11,118
1,429
MMBtu
TOTAL IMPLEMENTED Savings:
$27,360
Cost:
-
$25,493 286,408 $1,867 461 - - $25,493
286,408
kWh
$1,867
461
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas