IAC Assessment: MZ0199
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2015
Principal Product soft toys
NAICS 339930 - Doll, Toy, and Game Manufacturing
SIC 3944 - Games, Toys, and Children's Vehicles, Except Dolls and Bicycles
Sales $10,000,000-$50,000,000
# of Employees 95
Plant Area (Sq.Ft.) 104,800
Annual Production 1,200,000 Pieces
Production Hrs. Annual 3,850
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $119,070 2,178,549 kWh $0.05
Electricity Demand $73,619 9,526 kW-months/year $7.73
Natural Gas $30,484 2,601 MMBtu $11.72
TOTAL ENERGY COSTS $223,173
RECOMMENDED SAVINGS* $71,336 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 4.512 CONDENSE OPERATION INTO ONE BUILDING Savings:
$14,201
Cost:
$28,800
$11,071 202,566 $3,130 405 - - $11,071
202,566
kWh
$3,130
405
kW-months/year
-
-
MMBtu
02: 4.512 CONDENSE OPERATION INTO ONE BUILDING Savings:
$19,376
Cost:
$2,500
$7,019 128,415 $1,352 175 $11,005 939 $7,019
128,415
kWh
$1,352
175
kW-months/year
$11,005
939
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$31,470
Cost:
$116,250
$21,849 399,438 $9,621 1,245 - - $21,849
399,438
kWh
$9,621
1,245
kW-months/year
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,508
Cost:
$440
$1,508 27,590 - - - - $1,508
27,590
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$279
Cost:
$20
$194 3,554 $85 11 - - $194
3,554
kWh
$85
11
kW-months/year
-
-
MMBtu
06: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$4,502
Cost:
$27,000
$3,126 57,200 $1,376 178 - - $3,126
57,200
kWh
$1,376
178
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$71,336
Cost:
$175,010
$44,767 818,763 $15,564 2,014 $11,005 939 $44,767
818,763
kWh
$15,564
2,014
kW-months/year
$11,005
939
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas