IAC Assessment: MZ0213
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0213
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2016
Principal Product switch gear
NAICS 335313 - Switchgear and Switchboard Apparatus Manufacturing
SIC 3643 - Current-carrying Wiring Devices
Sales $10,000,000-$50,000,000
# of Employees 222
Plant Area (Sq.Ft.) 164,000
Annual Production 12,000 Units
Production Hrs. Annual 6,480
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $130,826 2,926,754 kWh $0.04
Electricity Demand $111,809 5,894 kW-months/year $18.97
Natural Gas $43,685 3,523 MMBtu $12.40
TOTAL ENERGY COSTS $286,320
RECOMMENDED SAVINGS* $48,245 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,815
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,940
Cost:
$1,100
$1,940 43,400 - - - - $1,940
43,400
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$29,759
Cost:
$2,500
$6,560 146,760 $3,796 200 $19,403 1,565 $6,560
146,760
kWh
$3,796
200
kW-months/year
$19,403
1,565
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,111
Cost:
$2,000
$1,745 39,041 $1,366 72 - - $1,745
39,041
kWh
$1,366
72
kW-months/year
-
-
MMBtu
04: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$11,560
Cost:
$67,500
$6,476 144,888 $5,084 268 - - $6,476
144,888
kWh
$5,084
268
kW-months/year
-
-
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,875
Cost:
$6,000
$1,875 41,950 - - - - $1,875
41,950
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$48,245
Cost:
$79,100
$18,596 416,039 $10,246 540 $19,403 1,565 $18,596
416,039
kWh
$10,246
540
kW-months/year
$19,403
1,565
MMBtu
TOTAL IMPLEMENTED Savings:
$3,815
Cost:
$7,100
$3,815 85,350 - - - - $3,815
85,350
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas