IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2016
Principal Product Automotive service equipment
NAICS 334515 - Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals
SIC 3825 - Instruments To Measure Electricity
Sales $10,000,000-$50,000,000
# of Employees 205
Plant Area (Sq.Ft.) 207,000
Annual Production 40,000 Units
Production Hrs. Annual 2,125
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $271,798 3,305,007 kWh $0.08
Electricity Demand $22,613 8,975 kW-months/year $2.52
Natural Gas $88,087 7,914 MMBtu $11.13
TOTAL ENERGY COSTS $382,498
RECOMMENDED SAVINGS* $71,353 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,384
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 4.512 CONDENSE OPERATION INTO ONE BUILDING Savings:
$4,197
Cost:
$900
$4,197 51,060 - - - - $4,197
51,060
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$27,674
Cost:
$30,000
$25,704 312,699 $1,970 782 - - $25,704
312,699
kWh
$1,970
782
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$23,739
Cost:
$80,500
$20,236 246,181 $3,503 1,390 - - $20,236
246,181
kWh
$3,503
1,390
kW-months/year
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,607
Cost:
$3,000
$6,607 80,385 - - - - $6,607
80,385
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$841
Cost:
$1,100
$717 8,719 $124 49 - - $717
8,719
kWh
$124
49
kW-months/year
-
-
MMBtu
06: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$7,627
Cost:
$20,000
- - - - $7,627 685 -
-
kWh
-
-
kW-months/year
$7,627
685
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$668
Cost:
$600
- - - - $668 60 -
-
kWh
-
-
kW-months/year
$668
60
MMBtu
TOTAL RECOMMENDED Savings:
$71,353
Cost:
$136,100
$57,461 699,044 $5,597 2,221 $8,295 745 $57,461
699,044
kWh
$5,597
2,221
kW-months/year
$8,295
745
MMBtu
TOTAL IMPLEMENTED Savings:
$35,384
Cost:
$85,500
$31,757 386,345 $3,627 1,439 - - $31,757
386,345
kWh
$3,627
1,439
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas