Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri-Columbia |
---|---|
Assessment Year | 2017 |
Principal Product | metal food containers |
NAICS | 332431 - Metal Can Manufacturing |
SIC | 3411 - Metal Cans |
Sales | $50,000,000-$100,000,000 |
# of Employees | 142 |
Plant Area (Sq.Ft.) | 500,000 |
Annual Production | 2,190,000,000 Pieces |
Production Hrs. Annual | 8,496 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $891,114 | 17,534,617 | kWh | $0.05 |
Electricity Demand | $270,241 | 27,597 | kW-months/year | $9.79 |
Natural Gas | $572,940 | 161,355 | MMBtu | $3.55 |
TOTAL ENERGY COSTS | $1,734,295 | |||
RECOMMENDED SAVINGS* | $106,029 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $99,373 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $20,566 Cost: - |
$16,121 | 322,423 | $4,445 | 455 | - | - |
$16,121 322,423 kWh |
$4,445 455 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $6,898 Cost: $46,100 |
$6,398 | 127,950 | $500 | 51 | - | - |
$6,398 127,950 kWh |
$500 51 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $150 Cost: $280 |
$116 | 2,325 | $34 | 4 | - | - |
$116 2,325 kWh |
$34 4 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,371 Cost: - |
$3,279 | 65,587 | $1,092 | 112 | - | - |
$3,279 65,587 kWh |
$1,092 112 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4227 USE COMPRESSOR AIR FILTERS |
Savings: $2,071 Cost: $900 |
$1,623 | 32,464 | $448 | 46 | - | - |
$1,623 32,464 kWh |
$448 46 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $6,568 Cost: $2,900 |
$4,234 | 84,669 | $2,334 | 239 | - | - |
$4,234 84,669 kWh |
$2,334 239 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $58,749 Cost: $17,550 |
$46,052 | 921,031 | $12,697 | 1,301 | - | - |
$46,052 921,031 kWh |
$12,697 1,301 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $966 Cost: $4,050 |
- | - | - | - | $966 | 272 |
- - kWh |
- - kW-months/year |
$966 272 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.9112 USE SOLAR HEAT TO HEAT WATER |
Savings: $5,690 Cost: $96,550 |
$5,690 | 111,572 | - | - | - | - |
$5,690 111,572 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $106,029 Cost: $168,330 |
$83,513 | 1,668,021 | $21,550 | 2,208 | $966 | 272 | $83,513 1,668,021 kWh |
$21,550 2,208 kW-months/year |
$966 272 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $99,373 Cost: $67,730 |
$77,823 | 1,556,449 | $21,550 | 2,208 | - | - | $77,823 1,556,449 kWh |
$21,550 2,208 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |