IAC Assessment: MZ0259
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0259
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2018
Principal Product wastewater and sewage treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 51
Plant Area (Sq.Ft.) 1,407,000
Annual Production 5,110,000 Units
Production Hrs. Annual 8,760
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $380,151 7,969,258 kWh $0.05
Electricity Demand $117,983 34,730 kW-months/year $3.40
Natural Gas $43,992 5,766 MMBtu $7.63
TOTAL ENERGY COSTS $542,126
RECOMMENDED SAVINGS* $211,429 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $70,941
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Usage Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Water Usage Solid Waste (non-haz) One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,010
Cost:
$29,034
$4,918 102,466 $852 247 - - - - $1,240 - $4,918
102,466
kWh
$852
247
kW-months/year
-
-
Tgal
-
-
lb
$1,240
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$504
Cost:
$780
$442 9,214 $62 18 - - - - - - $442
9,214
kWh
$62
18
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$140,488
Cost:
$304,000
$(-11,213) (-233,611) $(-1,299) (-377) - - $153,000 10,880,000 - - $(-11,213)
(-233,611)
kWh
$(-1,299)
(-377)
kW-months/year
-
-
Tgal
$153,000
10,880,000
lb
-
-
$
04: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$63,427
Cost:
$203,000
- - - - $63,427 22,412,560 - - - - -
-
kWh
-
-
kW-months/year
$63,427
22,412,560
Tgal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$211,429
Cost:
$536,814
$(-5,853) (-121,931) $(-385) (-112) $63,427 22,412,560 $153,000 10,880,000 $1,240 - $(-5,853)
(-121,931)
kWh
$(-385)
(-112)
kW-months/year
$63,427
22,412,560
Tgal
$153,000
10,880,000
lb
$1,240
-
$
TOTAL IMPLEMENTED Savings:
$70,941
Cost:
$232,814
$5,360 111,680 $914 265 $63,427 22,412,560 - - $1,240 - $5,360
111,680
kWh
$914
265
kW-months/year
$63,427
22,412,560
Tgal
-
-
lb
$1,240
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $
Electricity Usage Electricity Demand Water Usage Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Water Usage Solid Waste (non-haz) One-time Revenue or Avoided Cost