Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri-Columbia |
---|---|
Assessment Year | 2018 |
Principal Product | wastewater and sewage treatment |
NAICS | 221320 - Sewage Treatment Facilities |
SIC | 4952 - Sewerage Systems |
Sales | <$500,000 |
# of Employees | 51 |
Plant Area (Sq.Ft.) | 1,407,000 |
Annual Production | 5,110,000 Units |
Production Hrs. Annual | 8,760 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $380,151 | 7,969,258 | kWh | $0.05 |
Electricity Demand | $117,983 | 34,730 | kW-months/year | $3.40 |
Natural Gas | $43,992 | 5,766 | MMBtu | $7.63 |
TOTAL ENERGY COSTS | $542,126 | |||
RECOMMENDED SAVINGS* | $211,429 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $70,941 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Usage | Solid Waste (non-haz) | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Water Usage | Solid Waste (non-haz) | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,010 Cost: $29,034 |
$4,918 | 102,466 | $852 | 247 | - | - | - | - | $1,240 | - |
$4,918 102,466 kWh |
$852 247 kW-months/year |
- - Tgal |
- - lb |
$1,240 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $504 Cost: $780 |
$442 | 9,214 | $62 | 18 | - | - | - | - | - | - |
$442 9,214 kWh |
$62 18 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $140,488 Cost: $304,000 |
$(-11,213) | (-233,611) | $(-1,299) | (-377) | - | - | $153,000 | 10,880,000 | - | - |
$(-11,213) (-233,611) kWh |
$(-1,299) (-377) kW-months/year |
- - Tgal |
$153,000 10,880,000 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $63,427 Cost: $203,000 |
- | - | - | - | $63,427 | 22,412,560 | - | - | - | - |
- - kWh |
- - kW-months/year |
$63,427 22,412,560 Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $211,429 Cost: $536,814 |
$(-5,853) | (-121,931) | $(-385) | (-112) | $63,427 | 22,412,560 | $153,000 | 10,880,000 | $1,240 | - | $(-5,853) (-121,931) kWh |
$(-385) (-112) kW-months/year |
$63,427 22,412,560 Tgal |
$153,000 10,880,000 lb |
$1,240 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $70,941 Cost: $232,814 |
$5,360 | 111,680 | $914 | 265 | $63,427 | 22,412,560 | - | - | $1,240 | - | $5,360 111,680 kWh |
$914 265 kW-months/year |
$63,427 22,412,560 Tgal |
- - lb |
$1,240 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Usage | Solid Waste (non-haz) | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Water Usage | Solid Waste (non-haz) | One-time Revenue or Avoided Cost |