Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri-Columbia |
---|---|
Assessment Year | 2018 |
Principal Product | processed wastewater and sludge from sewage of City of Columbia, Missour |
NAICS | 221320 - Sewage Treatment Facilities |
SIC | 4952 - Sewerage Systems |
Sales | <$500,000 |
# of Employees | 96 |
Plant Area (Sq.Ft.) | 875,000 |
Annual Production | 5,110,000 Thousand Gallons |
Production Hrs. Annual | 8,760 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $693,770 | 9,210,560 | kWh | $0.08 |
Electricity Demand | $20,158 | 15,546 | kW-months/year | $1.30 |
Natural Gas | $59,379 | 7,134 | MMBtu | $8.32 |
TOTAL ENERGY COSTS | $773,306 | |||
RECOMMENDED SAVINGS* | $82,590 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $54,411 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $21,384 Cost: $25,688 |
$20,835 | 277,794 | $550 | 423 | - | - | - | - |
$20,835 277,794 kWh |
$550 423 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $577 Cost: $450 |
- | - | - | - | $577 | 69 | - | - |
- - kWh |
- - kW-months/year |
$577 69 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $32,450 Cost: $7,600 |
$32,450 | 432,674 | - | - | - | - | - | - |
$32,450 432,674 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $16,122 Cost: $23,576 |
$11,924 | 158,994 | $283 | 218 | - | - | $3,915 | - |
$11,924 158,994 kWh |
$283 218 kW-months/year |
- - MMBtu |
$3,915 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $12,057 Cost: $59,524 |
$(-4,927) | (-65,700) | $(-117) | (-90) | $(-24,479) | (-2,942) | $41,580 | - |
$(-4,927) (-65,700) kWh |
$(-117) (-90) kW-months/year |
$(-24,479) (-2,942) MMBtu |
$41,580 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $82,590 Cost: $116,838 |
$60,282 | 803,762 | $716 | 551 | $(-23,902) | (-2,873) | $45,495 | - | $60,282 803,762 kWh |
$716 551 kW-months/year |
$(-23,902) (-2,873) MMBtu |
$45,495 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $54,411 Cost: $33,738 |
$53,285 | 710,468 | $550 | 423 | $577 | 69 | - | - | $53,285 710,468 kWh |
$550 423 kW-months/year |
$577 69 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost |