IAC Assessment: MZ0260
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0260
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2018
Principal Product processed wastewater and sludge from sewage of City of Columbia, Missour
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 96
Plant Area (Sq.Ft.) 875,000
Annual Production 5,110,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $693,770 9,210,560 kWh $0.08
Electricity Demand $20,158 15,546 kW-months/year $1.30
Natural Gas $59,379 7,134 MMBtu $8.32
TOTAL ENERGY COSTS $773,306
RECOMMENDED SAVINGS* $82,590 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $54,411
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$21,384
Cost:
$25,688
$20,835 277,794 $550 423 - - - - $20,835
277,794
kWh
$550
423
kW-months/year
-
-
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$577
Cost:
$450
- - - - $577 69 - - -
-
kWh
-
-
kW-months/year
$577
69
MMBtu
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$32,450
Cost:
$7,600
$32,450 432,674 - - - - - - $32,450
432,674
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,122
Cost:
$23,576
$11,924 158,994 $283 218 - - $3,915 - $11,924
158,994
kWh
$283
218
kW-months/year
-
-
MMBtu
$3,915
-
$
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$12,057
Cost:
$59,524
$(-4,927) (-65,700) $(-117) (-90) $(-24,479) (-2,942) $41,580 - $(-4,927)
(-65,700)
kWh
$(-117)
(-90)
kW-months/year
$(-24,479)
(-2,942)
MMBtu
$41,580
-
$
TOTAL RECOMMENDED Savings:
$82,590
Cost:
$116,838
$60,282 803,762 $716 551 $(-23,902) (-2,873) $45,495 - $60,282
803,762
kWh
$716
551
kW-months/year
$(-23,902)
(-2,873)
MMBtu
$45,495
-
$
TOTAL IMPLEMENTED Savings:
$54,411
Cost:
$33,738
$53,285 710,468 $550 423 $577 69 - - $53,285
710,468
kWh
$550
423
kW-months/year
$577
69
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost