IAC Assessment: MZ0265
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0265
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2019
Principal Product Farming Equipment
NAICS 333111 - Farm Machinery and Equipment Manufacturing
SIC 3523 - Farm Machinery And Equipment
Sales $50,000,000-$100,000,000
# of Employees 210
Plant Area (Sq.Ft.) 349,000
Annual Production 4,800 Tons
Production Hrs. Annual 2,000
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $175,405 4,088,960 kWh $0.04
Electricity Demand $363,652 17,222 kW-months/year $21.12
Electricity Fees $2,659 - $ -
Natural Gas $161,380 32,835 MMBtu $4.91
TOTAL ENERGY COSTS $703,096
RECOMMENDED SAVINGS* $84,676 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $50,282
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$22,096
Cost:
$10,000
- - - - $22,096 - - - - - -
-
kWh
-
-
kW-months/year
$22,096
-
$
-
-
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$20,740
Cost:
$2,302
- - $20,740 982 - - - - - - -
-
kWh
$20,740
982
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$9,670
Cost:
$3,552
$2,447 57,030 $7,223 342 - - - - - - $2,447
57,030
kWh
$7,223
342
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,073
Cost:
$1,940
$1,926 44,894 $3,147 149 - - - - - - $1,926
44,894
kWh
$3,147
149
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,922
Cost:
$1,406
$876 20,411 $2,598 123 - - - - $(-552) - $876
20,411
kWh
$2,598
123
kW-months/year
-
-
$
-
-
MMBtu
$(-552)
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,079
Cost:
$2,052
$777 18,121 $2,302 109 - - - - - - $777
18,121
kWh
$2,302
109
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,033
Cost:
$4,192
$765 17,822 $2,268 107 - - - - - - $765
17,822
kWh
$2,268
107
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
08: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$14,079
Cost:
$20,625
- - - - $14,079 - - - - - -
-
kWh
-
-
kW-months/year
$14,079
-
$
-
-
MMBtu
-
-
$
09: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$3,984
Cost:
$2,731
$(-54) (-1,260) $(-160) (-8) - - $4,198 855 - - $(-54)
(-1,260)
kWh
$(-160)
(-8)
kW-months/year
-
-
$
$4,198
855
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$84,676
Cost:
$48,800
$6,737 157,018 $38,118 1,804 $36,175 - $4,198 855 $(-552) - $6,737
157,018
kWh
$38,118
1,804
kW-months/year
$36,175
-
$
$4,198
855
MMBtu
$(-552)
-
$
TOTAL IMPLEMENTED Savings:
$50,282
Cost:
$40,215
$4,344 101,248 $10,315 488 $36,175 - - - $(-552) - $4,344
101,248
kWh
$10,315
488
kW-months/year
$36,175
-
$
-
-
MMBtu
$(-552)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes