IAC logo
IAC Assessment: MZ0267
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0267
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2019
Principal Product processed wastewater and sludge from sewage of City of Nixa, Missouri
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 5
Plant Area (Sq.Ft.) 326,040
Annual Production 438,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $197,174 2,252,640 kWh $0.09
Electricity Demand $27,900 3,600 kW-months/year $7.75
TOTAL ENERGY COSTS $335,074
RECOMMENDED SAVINGS* $76,044 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $74,099
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Usage Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Water Usage Solid Waste (non-haz) One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,711
Cost:
$4,573
$3,379 38,394 $501 65 - - - - $831 - $3,379
38,394
kWh
$501
65
kW-months/year
-
-
Tgal
-
-
lb
$831
-
$
02: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,079
Cost:
$410
$1,079 12,264 - - - - - - - - $1,079
12,264
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$53,575
Cost:
$240,000
$(-6,852) (-77,870) $(-973) (-125) - - $61,400 820,000 - - $(-6,852)
(-77,870)
kWh
$(-973)
(-125)
kW-months/year
-
-
Tgal
$61,400
820,000
lb
-
-
$
04: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$15,813
Cost:
$73,900
- - - - $15,813 10,542 - - - - -
-
kWh
-
-
kW-months/year
$15,813
10,542
Tgal
-
-
lb
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$866
Cost:
-
$771 8,760 $95 12 - - - - - - $771
8,760
kWh
$95
12
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$76,044
Cost:
$318,883
$(-1,623) (-18,452) $(-377) (-48) $15,813 10,542 $61,400 820,000 $831 - $(-1,623)
(-18,452)
kWh
$(-377)
(-48)
kW-months/year
$15,813
10,542
Tgal
$61,400
820,000
lb
$831
-
$
TOTAL IMPLEMENTED Savings:
$74,099
Cost:
$318,473
$(-3,473) (-39,476) $(-472) (-60) $15,813 10,542 $61,400 820,000 $831 - $(-3,473)
(-39,476)
kWh
$(-472)
(-60)
kW-months/year
$15,813
10,542
Tgal
$61,400
820,000
lb
$831
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $
Electricity Usage Electricity Demand Water Usage Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Water Usage Solid Waste (non-haz) One-time Revenue or Avoided Cost