IAC Assessment: MZ0272
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0272
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2019
Principal Product Shrink wrapping machines
NAICS 333993 - Packaging Machinery Manufacturing
SIC 3565 - Packaging Machinery
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 100,000
Annual Production 150 Pieces
Production Hrs. Annual 5,200
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $100,448 1,167,120 kWh $0.09
Electricity Demand $12,260 3,724 kW-months/year $3.29
Natural Gas $4,979 570 MMBtu $8.74
TOTAL ENERGY COSTS $117,687
RECOMMENDED SAVINGS* $86,057 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,909
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,929
Cost:
$250
$1,771 20,598 $158 48 - - - - $1,771
20,598
kWh
$158
48
kW-months/year
-
-
$
-
-
$
02: 2.6127 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT Savings:
$241
Cost:
$105
$241 2,808 - - - - - - $241
2,808
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,572
Cost:
$29,988
$13,868 161,258 $1,224 372 - - $1,480 - $13,868
161,258
kWh
$1,224
372
kW-months/year
-
-
$
$1,480
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,084
Cost:
$1,860
$2,084 24,239 - - - - - - $2,084
24,239
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$262
Cost:
$1,040
$227 2,635 $35 11 - - - - $227
2,635
kWh
$35
11
kW-months/year
-
-
$
-
-
$
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$7,655
Cost:
$180
$5,388 62,652 $2,267 689 - - - - $5,388
62,652
kWh
$2,267
689
kW-months/year
-
-
$
-
-
$
07: 4.132 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST Savings:
$31,952
Cost:
$68,000
$(-9,605) (-111,690) $(-592) (-180) $42,149 - - - $(-9,605)
(-111,690)
kWh
$(-592)
(-180)
kW-months/year
$42,149
-
$
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$331
Cost:
$180
$305 3,547 $26 8 - - - - $305
3,547
kWh
$26
8
kW-months/year
-
-
$
-
-
$
09: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$25,031
Cost:
$126,000
$23,784 276,553 $1,247 379 - - - - $23,784
276,553
kWh
$1,247
379
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$86,057
Cost:
$227,603
$38,063 442,600 $4,365 1,327 $42,149 - $1,480 - $38,063
442,600
kWh
$4,365
1,327
kW-months/year
$42,149
-
$
$1,480
-
$
TOTAL IMPLEMENTED Savings:
$11,909
Cost:
$2,395
$9,484 110,297 $2,425 737 - - - - $9,484
110,297
kWh
$2,425
737
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost