IAC logo
IAC Assessment: MZ0279
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0279
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2019
Principal Product Fabricare cleaning products
NAICS 325611 - Soap and Other Detergent Manufacturing
SIC 2841 - Soap And Other Detergents
Sales $100,000,000-$500,000,000
# of Employees 385
Plant Area (Sq.Ft.) 301,378
Annual Production 308,000 Tons
Production Hrs. Annual 8,760
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $578,104 12,189,955 kWh $0.05
Natural Gas $68,629 20,654 MMBtu $3.32
TOTAL ENERGY COSTS $653,562
RECOMMENDED SAVINGS* $155,932 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $71,821
#|Description Savings
Cost
Status Electricity Usage Natural Gas One-time Revenue or Avoided Cost Electricity Usage Natural Gas One-time Revenue or Avoided Cost
$ kWh $ MMBtu $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,031
Cost:
$4,700
$3,031 63,940 - - - - $3,031
63,940
kWh
-
-
MMBtu
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$78,987
Cost:
$1,980
$78,987 1,666,387 - - - - $78,987
1,666,387
kWh
-
-
MMBtu
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,014
Cost:
$640
$4,014 84,693 - - - - $4,014
84,693
kWh
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$27,794
Cost:
$6,252
$27,794 586,380 - - - - $27,794
586,380
kWh
-
-
MMBtu
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$16,719
Cost:
$14,400
- - $16,719 5,036 - - -
-
kWh
$16,719
5,036
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$428
Cost:
$1,464
- - $428 128 - - -
-
kWh
$428
128
MMBtu
-
-
$
07: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$19,835
Cost:
$25,600
$8,635 182,208 - - $11,200 - $8,635
182,208
kWh
-
-
MMBtu
$11,200
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,601
Cost:
$220
$2,601 54,837 - - - - $2,601
54,837
kWh
-
-
MMBtu
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,523
Cost:
$1,080
$2,523 53,700 - - - - $2,523
53,700
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$155,932
Cost:
$56,336
$127,585 2,692,145 $17,147 5,164 $11,200 - $127,585
2,692,145
kWh
$17,147
5,164
MMBtu
$11,200
-
$
TOTAL IMPLEMENTED Savings:
$71,821
Cost:
$53,056
$43,474 917,221 $17,147 5,164 $11,200 - $43,474
917,221
kWh
$17,147
5,164
MMBtu
$11,200
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas One-time Revenue or Avoided Cost Electricity Usage Natural Gas One-time Revenue or Avoided Cost