IAC logo
IAC Assessment: MZ0294
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0294
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2020
Principal Product Metal cans for food
NAICS 332431 - Metal Can Manufacturing
SIC 3411 - Metal Cans
Sales $100,000,000-$500,000,000
# of Employees 150
Plant Area (Sq.Ft.) 155,000
Annual Production 6,500,000,000 Pieces
Production Hrs. Annual 8,640
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $569,176 13,374,680 kWh $0.04
Electricity Demand $464,002 22,435 kW-months/year $20.68
Natural Gas $24,508 7,410 MMBtu $3.31
TOTAL ENERGY COSTS $1,063,626
RECOMMENDED SAVINGS* $121,491 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,801
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$75,290
Cost:
$44,400
$45,139 1,049,760 $30,151 1,458 - - $45,139
1,049,760
kWh
$30,151
1,458
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,816
Cost:
$13,638
$4,068 94,617 $2,809 136 $939 - $4,068
94,617
kWh
$2,809
136
kW-months/year
$939
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,295
Cost:
$2,760
$1,295 30,130 - - - - $1,295
30,130
kWh
-
-
kW-months/year
-
-
$
04: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$519
Cost:
$160
$311 7,240 $208 10 - - $311
7,240
kWh
$208
10
kW-months/year
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$506
Cost:
$50
$305 7,092 $201 10 - - $305
7,092
kWh
$201
10
kW-months/year
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$542
Cost:
$240
$325 7,565 $217 11 - - $325
7,565
kWh
$217
11
kW-months/year
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$35,523
Cost:
$60,200
$21,297 495,296 $14,226 688 - - $21,297
495,296
kWh
$14,226
688
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$121,491
Cost:
$121,448
$72,740 1,691,700 $47,812 2,312 $939 - $72,740
1,691,700
kWh
$47,812
2,312
kW-months/year
$939
-
$
TOTAL IMPLEMENTED Savings:
$1,801
Cost:
$2,810
$1,600 37,222 $201 10 - - $1,600
37,222
kWh
$201
10
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost