IAC logo
IAC Assessment: MZ0297
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0297
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2020
Principal Product Wine and bourbon barrel staves and headings
NAICS 321920 - Wood Container and Pallet Manufacturing
SIC 2449 - Wood Containers, Nec
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 70,000
Annual Production 93,600 Pieces
Production Hrs. Annual 4,680
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $334,018 5,095,280 kWh $0.07
Electricity Demand $40,320 12,590 kW-months/year $3.20
TOTAL ENERGY COSTS $374,338
RECOMMENDED SAVINGS* $37,398 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,624
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$22,041
Cost:
$51,700
$17,574 266,269 $4,467 1,396 $17,574
266,269
kWh
$4,467
1,396
kW-months/year
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$773
Cost:
$320
$680 10,299 $93 29 $680
10,299
kWh
$93
29
kW-months/year
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$7,129
Cost:
$24,780
- - $7,129 2,256 -
-
kWh
$7,129
2,256
kW-months/year
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$320
Cost:
$840
$320 4,847 - - $320
4,847
kWh
-
-
kW-months/year
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,880
Cost:
$2,595
$1,654 25,055 $226 71 $1,654
25,055
kWh
$226
71
kW-months/year
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,857
Cost:
$350
$1,857 28,135 - - $1,857
28,135
kWh
-
-
kW-months/year
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,001
Cost:
$1,050
$2,640 40,004 $361 113 $2,640
40,004
kWh
$361
113
kW-months/year
08: 2.6127 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT Savings:
$397
Cost:
$300
$397 6,017 - - $397
6,017
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$37,398
Cost:
$81,935
$25,122 380,626 $12,276 3,865 $25,122
380,626
kWh
$12,276
3,865
kW-months/year
TOTAL IMPLEMENTED Savings:
$33,624
Cost:
$80,565
$21,802 330,323 $11,822 3,723 $21,802
330,323
kWh
$11,822
3,723
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand