IAC logo
IAC Assessment: MZ0298
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0298
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2020
Principal Product Oak wood wine and whiskey barrels
NAICS 321920 - Wood Container and Pallet Manufacturing
SIC 2449 - Wood Containers, Nec
Sales $100,000,000-$500,000,000
# of Employees 300
Plant Area (Sq.Ft.) 420,000
Annual Production 780,000 Pieces
Production Hrs. Annual 5,200
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,394,184 20,382,480 kWh $0.07
Electricity Demand $448,603 47,216 kW-months/year $9.50
Natural Gas $258,554 33,148 MMBtu $7.80
TOTAL ENERGY COSTS $2,159,579
RECOMMENDED SAVINGS* $150,619 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $110,019
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Primary Raw Material One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Water Disposal Primary Raw Material One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$11,238
Cost:
$800
$8,423 123,880 $2,815 297 - - - - - - $8,423
123,880
kWh
$2,815
297
kW-months/year
-
-
Tgal
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,146
Cost:
$350
$7,672 112,821 $2,474 260 - - - - - - $7,672
112,821
kWh
$2,474
260
kW-months/year
-
-
Tgal
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,824
Cost:
$8,850
$5,824 85,635 - - - - - - - - $5,824
85,635
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$544
Cost:
$2,220
$544 8,000 - - - - - - - - $544
8,000
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,537
Cost:
$740
$3,431 50,455 $1,106 116 - - - - - - $3,431
50,455
kWh
$1,106
116
kW-months/year
-
-
Tgal
-
-
$
-
-
$
06: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE Savings:
$8,154
Cost:
-
$6,165 90,668 $1,989 209 - - - - - - $6,165
90,668
kWh
$1,989
209
kW-months/year
-
-
Tgal
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,731
Cost:
$2,790
$921 13,541 $297 31 - - - - $513 - $921
13,541
kWh
$297
31
kW-months/year
-
-
Tgal
-
-
$
$513
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,093
Cost:
$1,639
$1,093 16,067 - - - - - - - - $1,093
16,067
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
09: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$29,362
Cost:
$25,600
- - - - $29,362 941,104 - - - - -
-
kWh
-
-
kW-months/year
$29,362
941,104
Tgal
-
-
$
-
-
$
10: 2.6127 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT Savings:
$756
Cost:
$288
$756 11,123 - - - - - - - - $756
11,123
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
11: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$77,234
Cost:
$900
- - - - - - $77,234 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$77,234
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$150,619
Cost:
$44,177
$34,829 512,190 $8,681 913 $29,362 941,104 $77,234 - $513 - $34,829
512,190
kWh
$8,681
913
kW-months/year
$29,362
941,104
Tgal
$77,234
-
$
$513
-
$
TOTAL IMPLEMENTED Savings:
$110,019
Cost:
$17,777
$26,406 388,310 $5,866 616 - - $77,234 - $513 - $26,406
388,310
kWh
$5,866
616
kW-months/year
-
-
Tgal
$77,234
-
$
$513
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $
Electricity Usage Electricity Demand Water Disposal Primary Raw Material One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Water Disposal Primary Raw Material One-time Revenue or Avoided Cost