Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri-Columbia |
---|---|
Assessment Year | 2021 |
Principal Product | PE and PVC Pipes |
NAICS | 326122 - Plastics Pipe and Pipe Fitting Manufacturing |
SIC | 3084 - Plastics Pipe |
Sales | $10,000,000-$50,000,000 |
# of Employees | 42 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 13,500,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $433,026 | 8,905,936 | kWh | $0.05 |
Electricity Demand | $368,497 | 17,032 | kW-months/year | $21.64 |
Natural Gas | $110,565 | 23,008 | MMBtu | $4.81 |
TOTAL ENERGY COSTS | $965,522 | |||
RECOMMENDED SAVINGS* | $72,475 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $72,475 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $1,825 Cost: $9,000 |
- | - | - | - | $1,825 | 379 | - | - |
- - kWh |
- - kW-months/year |
$1,825 379 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $24,692 Cost: $44,928 |
$24,692 | 503,971 | - | - | - | - | - | - |
$24,692 503,971 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $27,350 Cost: $93,000 |
$17,041 | 347,772 | $10,309 | 476 | - | - | - | - |
$17,041 347,772 kWh |
$10,309 476 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $579 Cost: $320 |
$579 | 11,842 | - | - | - | - | - | - |
$579 11,842 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $16,340 Cost: $5,200 |
- | - | - | - | - | - | $16,340 | 4,373 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$16,340 4,373 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,689 Cost: $240 |
- | - | - | - | $1,689 | 351 | - | - |
- - kWh |
- - kW-months/year |
$1,689 351 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $72,475 Cost: $152,688 |
$42,312 | 863,585 | $10,309 | 476 | $3,514 | 730 | $16,340 | 4,373 | $42,312 863,585 kWh |
$10,309 476 kW-months/year |
$3,514 730 MMBtu |
$16,340 4,373 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $72,475 Cost: $152,688 |
$42,312 | 863,585 | $10,309 | 476 | $3,514 | 730 | $16,340 | 4,373 | $42,312 863,585 kWh |
$10,309 476 kW-months/year |
$3,514 730 MMBtu |
$16,340 4,373 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal |