IAC Assessment: MZ0309
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0309
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2021
Principal Product Human edible poultry products & Protein ingredients for animal feeds
NAICS 311613 - Rendering and Meat Byproduct Processing
SIC 2077 - Animal And Marine Fats And Oils
Sales $100,000,000-$500,000,000
# of Employees 790
Plant Area (Sq.Ft.) 370,000
Annual Production 1,000,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,970,607 58,816,318 kWh $0.05
Electricity Demand $1,350,393 109,922 kW-months/year $12.29
Natural Gas $3,335,372 2,627,054 MMBtu $1.27
TOTAL ENERGY COSTS $7,656,372
RECOMMENDED SAVINGS* $839,975 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $444,974
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$65,174
Cost:
$960
- - - - $65,174 29,356 - - -
-
kWh
-
-
kW-months/year
$65,174
29,356
MMBtu
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$8,714
Cost:
$960
$5,549 108,806 $3,165 258 - - - - $5,549
108,806
kWh
$3,165
258
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$41,876
Cost:
$42,513
$41,876 812,103 - - - - - - $41,876
812,103
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$11,649
Cost:
$4,200
$7,960 156,079 $3,689 300 - - - - $7,960
156,079
kWh
$3,689
300
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,736
Cost:
$4,920
$3,016 59,128 $1,720 140 - - - - $3,016
59,128
kWh
$1,720
140
kW-months/year
-
-
MMBtu
-
-
$
06: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$353,125
Cost:
$770,000
$184,540 3,618,435 $182,752 14,870 $(-4,167) (-13,023) $(-10,000) - $184,540
3,618,435
kWh
$182,752
14,870
kW-months/year
$(-4,167)
(-13,023)
MMBtu
$(-10,000)
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$354,701
Cost:
$442,138
- - $354,701 28,861 - - - - -
-
kWh
$354,701
28,861
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$839,975
Cost:
$1,265,691
$242,941 4,754,551 $546,027 44,429 $61,007 16,333 $(-10,000) - $242,941
4,754,551
kWh
$546,027
44,429
kW-months/year
$61,007
16,333
MMBtu
$(-10,000)
-
$
TOTAL IMPLEMENTED Savings:
$444,974
Cost:
$453,178
$16,525 324,013 $363,275 29,559 $65,174 29,356 - - $16,525
324,013
kWh
$363,275
29,559
kW-months/year
$65,174
29,356
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost