Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri-Columbia |
---|---|
Assessment Year | 2021 |
Principal Product | Non ferrous grounding products |
NAICS | 331524 - Aluminum Foundries (except Die-Casting) |
SIC | 3365 - Aluminum Foundries |
Sales | $10,000,000-$50,000,000 |
# of Employees | 12 |
Plant Area (Sq.Ft.) | 63,420 |
Annual Production | 6,700,000 Pieces |
Production Hrs. Annual | 3,675 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $172,178 | 3,297,965 | kWh | $0.05 |
Electricity Demand | $47,379 | 14,399 | kW-months/year | $3.29 |
Natural Gas | $66,341 | 9,030 | MMBtu | $7.35 |
TOTAL ENERGY COSTS | $290,498 | |||
RECOMMENDED SAVINGS* | $58,918 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $32,583 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $687 Cost: $800 |
$570 | 10,966 | $117 | 36 | - | - |
$570 10,966 kWh |
$117 36 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $5,278 Cost: $240 |
- | - | - | - | $5,278 | 718 |
- - kWh |
- - kW-months/year |
$5,278 718 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY |
Savings: $3,002 Cost: $600 |
- | - | - | - | $3,002 | 409 |
- - kWh |
- - kW-months/year |
$3,002 409 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $1,762 Cost: $4,140 |
$1,849 | 35,566 | $(-87) | (-26) | - | - |
$1,849 35,566 kWh |
$(-87) (-26) kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $1,286 Cost: $480 |
$1,286 | 22,673 | - | - | - | - |
$1,286 22,673 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $13,167 Cost: $45,756 |
$10,856 | 208,776 | $2,311 | 686 | - | - |
$10,856 208,776 kWh |
$2,311 686 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT |
Savings: $22,855 Cost: $145,659 |
$(-7,928) | (-152,462) | $(-1,639) | (-498) | $32,422 | 4,411 |
$(-7,928) (-152,462) kWh |
$(-1,639) (-498) kW-months/year |
$32,422 4,411 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $7,401 Cost: $25,720 |
- | - | - | - | $7,401 | 1,007 |
- - kWh |
- - kW-months/year |
$7,401 1,007 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,480 Cost: $3,480 |
$2,884 | 55,471 | $596 | 181 | - | - |
$2,884 55,471 kWh |
$596 181 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $58,918 Cost: $226,875 |
$9,517 | 180,990 | $1,298 | 379 | $48,103 | 6,545 | $9,517 180,990 kWh |
$1,298 379 kW-months/year |
$48,103 6,545 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $32,583 Cost: $77,736 |
$14,561 | 277,981 | $2,341 | 696 | $15,681 | 2,134 | $14,561 277,981 kWh |
$2,341 696 kW-months/year |
$15,681 2,134 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |