IAC logo
IAC Assessment: MZ0332
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0332
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2022
Principal Product PVC pipe
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $50,000,000-$100,000,000
# of Employees 31
Plant Area (Sq.Ft.) 60,000
Annual Production 70,000,000 Pounds
Production Hrs. Annual 8,160
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $281,301 5,575,128 kWh $0.05
Electricity Demand $196,242 9,214 kW-months/year $21.30
Natural Gas $81,541 41,115 MMBtu $1.98
TOTAL ENERGY COSTS $581,802
RECOMMENDED SAVINGS* $170,841 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $73,208
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,571
Cost:
$18,580
$12,571 251,430 - - - - - - $12,571
251,430
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$87,851
Cost:
$670,334
$48,600 972,004 $39,251 1,843 - - - - $48,600
972,004
kWh
$39,251
1,843
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,554
Cost:
$7,980
$971 18,678 $583 27 - - - - $971
18,678
kWh
$583
27
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,676
Cost:
$1,330
$582 11,642 $1,094 51 - - - - $582
11,642
kWh
$1,094
51
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$506
Cost:
$780
$506 10,118 - - - - - - $506
10,118
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,198
Cost:
$720
- - - - $2,198 1,110 - - -
-
kWh
-
-
kW-months/year
$2,198
1,110
MMBtu
-
-
Tgal
07: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$5,524
Cost:
$7,544
- - - - - - $5,524 1,580 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,524
1,580
Tgal
08: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$58,961
Cost:
$200,000
$32,847 656,939 $26,114 1,226 - - - - $32,847
656,939
kWh
$26,114
1,226
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$170,841
Cost:
$907,268
$96,077 1,920,811 $67,042 3,148 $2,198 1,110 $5,524 1,580 $96,077
1,920,811
kWh
$67,042
3,148
kW-months/year
$2,198
1,110
MMBtu
$5,524
1,580
Tgal
TOTAL IMPLEMENTED Savings:
$73,208
Cost:
$219,910
$46,000 920,011 $27,208 1,277 - - - - $46,000
920,011
kWh
$27,208
1,277
kW-months/year
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal