Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri-Columbia |
---|---|
Assessment Year | 2022 |
Principal Product | PVC pipe |
NAICS | 325211 - Plastics Material and Resin Manufacturing |
SIC | 2821 - Plastics Materials And Resins |
Sales | $50,000,000-$100,000,000 |
# of Employees | 31 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 70,000,000 Pounds |
Production Hrs. Annual | 8,160 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $281,301 | 5,575,128 | kWh | $0.05 |
Electricity Demand | $196,242 | 9,214 | kW-months/year | $21.30 |
Natural Gas | $81,541 | 41,115 | MMBtu | $1.98 |
TOTAL ENERGY COSTS | $581,802 | |||
RECOMMENDED SAVINGS* | $170,841 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $73,208 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $12,571 Cost: $18,580 |
$12,571 | 251,430 | - | - | - | - | - | - |
$12,571 251,430 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $87,851 Cost: $670,334 |
$48,600 | 972,004 | $39,251 | 1,843 | - | - | - | - |
$48,600 972,004 kWh |
$39,251 1,843 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,554 Cost: $7,980 |
$971 | 18,678 | $583 | 27 | - | - | - | - |
$971 18,678 kWh |
$583 27 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,676 Cost: $1,330 |
$582 | 11,642 | $1,094 | 51 | - | - | - | - |
$582 11,642 kWh |
$1,094 51 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $506 Cost: $780 |
$506 | 10,118 | - | - | - | - | - | - |
$506 10,118 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $2,198 Cost: $720 |
- | - | - | - | $2,198 | 1,110 | - | - |
- - kWh |
- - kW-months/year |
$2,198 1,110 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $5,524 Cost: $7,544 |
- | - | - | - | - | - | $5,524 | 1,580 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$5,524 1,580 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL |
Savings: $58,961 Cost: $200,000 |
$32,847 | 656,939 | $26,114 | 1,226 | - | - | - | - |
$32,847 656,939 kWh |
$26,114 1,226 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $170,841 Cost: $907,268 |
$96,077 | 1,920,811 | $67,042 | 3,148 | $2,198 | 1,110 | $5,524 | 1,580 | $96,077 1,920,811 kWh |
$67,042 3,148 kW-months/year |
$2,198 1,110 MMBtu |
$5,524 1,580 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $73,208 Cost: $219,910 |
$46,000 | 920,011 | $27,208 | 1,277 | - | - | - | - | $46,000 920,011 kWh |
$27,208 1,277 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal |